P50 Agile P153
9 SCADA Communications
P153/EN M/B
9-9
2.2.2
Physical Connection and Link Layer
There are two options available for connecting on IEC 60870-5-103:
•
Front USB port
•
Rear serial port 1- for permanent SCADA connection via RS485
The IED address and baud rate can be selected using the front panel menu or with P50 Agile
configurator.
2.2.3
Initialisation
Whenever the device has been powered up, or if the communication parameters have been changed,
a reset command is required to initialize the communications. The device will respond to either of the
two reset commands; Reset CU or Reset FCB (Communication Unit or Frame Count Bit). The
difference between the two commands is that the Reset CU command will clear any unsent messages
in the transmit buffer, whereas the Reset FCB command does not delete any messages.
The device will respond to the reset command with an identification message ASDU 5. The Cause of
Transmission (COT) of this response will be either Reset CU or Reset FCB depending on the nature of
the reset command.
The relay will also produce a power up event, when the relay is powered up.
2.2.4
Time Synchronisation
The time and date can be set using the time synchronisation feature of the IEC 60870-5-103 protocol.
The device will correct the transmission delay depending on communication speed. For this,
transmission time, required for the time synchronization frame from the Master to IED, considering
current baud rate is added in the received time.
The device will correct the transmission delay depending on baud rate. If the time synchronisation
message is sent as a send/confirm message then the device will respond with a confirm message. A
time synchronisation Class 1 event will be generated/produced whether the time-synchronisation
message is sent as a send confirm or a broadcast (send/no reply) message.
2.2.5
Spontaneous Events
Events are categorized using the following information:
•
Function type
•
Information Number
The IEC 60870-5-103 profile contains a complete listing of all events produced by the device.
2.2.6
General Interrogation (GI)
The GI request can be used to read the status of the device, the function numbers, and information
numbers that will be returned during the GI cycle. These are shown in the IEC 60870-5-103 profile.
2.2.7
Cyclic Measurements
The device will produce measured values using ASDU9 and ASDU9 is reported with information
number 148 and 155. This can be read from the device using a Class 2 poll. For every query, the
current online data is reported.
The device transmits its measurands at 2.4 times the rated value of the analogue value.
Содержание Agile P153
Страница 3: ...P50 Agile P153 1 Introduction P153 EN M B 1 1 INTRODUCTION CHAPTER 1 ...
Страница 4: ...1 Introduction P50 Agile P153 1 2 P153 EN M B ...
Страница 10: ...1 Introduction P50 Agile P153 1 8 P153 EN M B ...
Страница 11: ...P50 Agile P153 2 Safety Information P153 EN M A 2 1 SAFETY INFORMATION CHAPTER 2 ...
Страница 22: ...Chapter 2 Safety Information P50 Agile P153 2 12 P153 EN M A ...
Страница 23: ...P50 Agile P153 3 Hardware Design P153 EN M B 3 1 HARDWARE DESIGN CHAPTER 3 ...
Страница 24: ...3 Hardware Design P50 Agile P153 3 2 P153 EN M B ...
Страница 32: ...3 Hardware Design P50 Agile P153 3 10 P153 EN M B ...
Страница 33: ...P50 Agile P153 4 Front Panel P153 EN M B 4 1 FRONT PANEL CHAPTER 4 ...
Страница 34: ...4 Front Panel P50 Agile P153 4 2 P153 EN M B ...
Страница 39: ...P50 Agile P153 5 Configuration P153 EN M B 5 1 CONFIGURATION CHAPTER 5 ...
Страница 40: ...P50 Agile P153 5 Configuration P153 EN M B 5 2 ...
Страница 150: ...P50 Agile P153 5 Configuration P153 EN M B 5 112 ...
Страница 151: ...P50 Agile P153 6 Protection Functions P153 EN M B 6 1 PROTECTION FUNCTIONS CHAPTER 6 ...
Страница 152: ...6 Protection Functions P50 Agile P153 6 2 P153 EN M B ...
Страница 167: ...P50 Agile P153 7 Protection Parameter Settings P153 EN M B 7 1 PROTECTION PARAMETER SETTINGS CHAPTER 7 ...
Страница 168: ...7 Protection Parameter Settings P50 Agile P153 7 2 P153 EN M B ...
Страница 189: ...P50 Agile P153 8 Monitoring Control P153 EN M B 8 1 MONITORING CONTROL CHAPTER 8 ...
Страница 190: ...8 Monitoring Control P50 Agile P153 8 2 P153 EN M B ...
Страница 207: ...P50 Agile P153 9 SCADA Communications P153 EN M B 9 1 SCADA COMMUNICATIONS CHAPTER 9 ...
Страница 208: ...12 SCADA Communications P50 Agile P153 9 2 P153 EN M B ...
Страница 220: ...12 SCADA Communications P50 Agile P153 9 14 P153 EN M B ...
Страница 221: ...P50 Agile P153 10 Installation P153 EN M B 10 1 INSTALLATION CHAPTER 10 ...
Страница 222: ...10 Installation P50 Agile P153 10 2 P153 EN M B ...
Страница 233: ...P50 Agile P153 13 Commissioning Instructions P153 EN M B 13 1 COMMISSIONING INSTRUCTIONS CHAPTER 11 ...
Страница 234: ...13 Commissioning Instructions P50 Agile P153 13 2 P153 EN M B ...
Страница 241: ...P50 Agile P153 12 Maintenance and Troubleshooting P153 EN M B 12 1 MAINTENANCE AND TROUBLESHOOTING CHAPTER 12 ...
Страница 242: ...12 Maintenance and Troubleshooting P50 Agile P153 12 2 P153 EN M B ...
Страница 250: ...12 Maintenance and Troubleshooting P50 Agile P153 12 10 P153 EN M B ...
Страница 251: ...P50 Agile P153 13 Technical Specifications P153 EN M B 13 1 TECHNICAL SPECIFICATIONS CHAPTER 13 ...
Страница 252: ...13 Technical Specifications P50 Agile P153 13 2 P153 EN M B ...
Страница 263: ...P50 Agile P153 14 Wiring Diagrams P153 EN M B 14 1 WIRING DIAGRAMS CHAPTER 14 ...
Страница 264: ...14 Wiring Diagrams P50 Agile P153 14 2 P153 EN M B ...
Страница 266: ...14 Wiring Diagrams P50 Agile P153 14 4 P153 EN M B 2 WIRING DIAGRAM Figure 1 P153 wiring diagram ...
Страница 267: ......