GFK-1322A
Q-1
Quick Start Guide
This Quick Start Guide describes the steps necessary to get your Series 90™ PLC L
ON
W
ORKS
®
Bus Interface Module (PE693BEM350, 351, and 352) up and running quickly. It assumes that you
have a working knowledge of L
ON
W
ORKS
network technology and GE Series 90-30 PLCs.
If you are unfamiliar with L
ON
W
ORKS
networks or with Series 90-30 PLCs, please refer to the
detailed instructions in the appropriate chapters in this manual and in the related documentation.
This chapter covers the following topics:
Module Description ...................................................................................................Q-2
What You Need to Operate the Bus Interface Module ................................................Q-6
Hardware Installation and Powerup ...........................................................................Q-7
Module Configuration/Network Installation...............................................................Q-8
PLC Configuration ..................................................................................................Q-11
Summary.................................................................................................................Q-12
Related Documentation
Series 90™-30 Programmable Controller Installation Manual (GFK-0356)
Logicmaster™ 90 Series 90-30/20/Micro Programming Software User’s
Manual (GFK-0466).
L
ON
W
ORKS
Installation Overview (005-0006-01)
For references to additional publications that may be helpful, refer to the
Preface in this manual.
Q
Appendix
Содержание 90-30 PLC
Страница 4: ......