GE H
EALTHCARE
VIVID FIVE
D
IRECTION
5273008-100, R
EVISION
8
B
ASIC
S
ERVICE
M
ANUAL
Chapter 3 System Setup
3 - 5
Section 3-3
Receiving and Unpacking the Equipment
When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
Unpacking the the equipment
1.) Remove all the strapping tapes from the packing box.
2.) Remove the upper cover of the packing box and then rotate the knob to the right to open the
packing box.
3.) Remove the PE bag and plastic film from the system.
4.) Remove Accessories Carton from the system.
5.) Remove the PE bag and plastic film from the syste
6.) Remove strapping tapes .
7.) Lift down the system .
CAUTION
Do not lift the unit by the Keyboard. Equipment damage may result.
CAUTION
The crate with the LOGIQ C3/C5 Premium weighs approximately 75kg. Be prepared for a sudden
shift of weight as the unit is removed from its base (pallet)
Figure 3-2 Open the box
2)
Содержание 5346769
Страница 1: ...GE Healthcare LOGIQ C3 C5 Premium Basic Service Manual Part Number 5341787 100 Revision 8 ...
Страница 2: ......
Страница 11: ...GE HEALTHCARE LOGIQ C3 C5 PREMIUM DIRECTION 5341787 100 REVISION 8 BASIC SERVICE MANUAL ix ZH CN KO ...
Страница 167: ......