6–16
350 FEEDER PROTECTION SYSTEM – INSTRUCTION MANUAL
S1 RELAY SETUP
CHAPTER 6: SETPOINTS
DNP communication
Figure 6-8: DNP communication settings
PATH
:
SETPOINTS > RELAY SETUP > COMMUNICATIONS > DNP PROTOCOL > DNP GENERAL
Please refer to the
3 Series Communications Guide
for details on how to set up the DNP
protocol.
For a complete list of Binary inputs, see Format Code FC134B in the
3 Series
Communications Guide
. Note that the format codes differ for each relay model.
3 Series IEC 61850
GOOSE details
The 350 firmware supports IEC61850 GOOSE communications on the optional
communications daughter board.
Portions of the IEC61850 standard not pertaining to GOOSE, are not implemented in the
350 .
Manufacturing Message Specification (MMS) standard ISO/IEC 9506 is only supported
when GOOSE type is set to “Advanced” (under
S1 RELAY SETUP > COMMUNICATIONS >
GOOSE CONFIGURATION > TRANSMISSION
) and the Communications order code option
includes IEC 61850.
Configuration of transmission and reception settings for the GOOSE feature are performed
using EnerVista 3 Series Setup software.
The 350 firmware accepts GOOSE messages from 8 Series, UR, F650 and UR Plus. The
interoperability with other manufacturers will be guaranteed in almost all cases, by
implementing the reception side with nested structures (one level of nesting) and all the
standard data types.
GOOSE settings changes will take effect only after the 350 is re-booted. One setting is
available to Enable/Disable both Transmission and Reception. It is possible to change this
setting from the Front Panel of the relay.
Refer to the
3 Series Communications Guide
for details on how to set up the IEC 61850
communications protocol.