background image

4  |  GE Oil & Gas

© 2015 General Electric Company. All rights reserved.

Under no circumstances should PTFE tape be used for sealing 
the fittings as this tends to shred small particles which may 
find their way into the instrument causing malfunctions�

The use of a soft setting anaerobic hydraulic seal is 
recommended, (e�g� Loctite Hydraulic Seal 542)� Follow the 
manufacturers recommendations�

Do not use an excessive amount as this will not set and could 
find its way into the instrument�

If the air supply is not of adequate quality, the device 
performance can be affected� Adequate quality can normally 
be achieved by the use of air filter regulators�

Electrical Installation

The electrical connections should be made as shown in the 
dimensional drawing Figure 1� The instrument is protected 
against reverse polarity to –100mA, no operation is possible 
in this condition�

The Model 4411 approximates a constant voltage load of 6�5 
volts across the loop terminals, therefore it is essential that the 
loop controller be capable of providing a constant current in 
the range 4-20mA with an output voltage of at least 6�5 volts� 

Voltage output controllers (e�g� variable voltage power 
supplies) are entirely unsuitable for the Model 4411 and could 
severely damage the electronic circuits�

Important Note

The control electronics of the Model 4411 incorporate precision 
electronics� The calibration of the unit may be affected by very 
high voltage spikes� Consequently, in environments where static 
electricity may be present ESD precautions should be used�

Wiring And Cable Entry

These instruments must be installed in accordance with local 
and national codes of practice, especially for hazardous 
area installations� The instruments are fully isolated from 
ground and therefore grounding is unnecessary for functional 
purposes� However, grounding may be necessary to conform 
to installation codes�

Note: It is strongly recommended that shielded cable or 

a grounded conduit be used to achieve maximum RFI 

immunity, if the installation has any risk of electromagnetic 

interference.

Conduit Entry

The instrument has twin conduit entry threaded 1/2" NPT� For 
explosion proof installation, a sealed conduit gland conforming 
to explosion-proof specifications must be used� A ground 
terminal is provided both internally and externally and should 

be used if ground continuity is essential� 

The unit is supplied with plastic blanking plugs, which must 
be removed before operation/calibration and replaced with a 
blanking plug conforming to the hazardous area certification 
rating applicable�

Calibration 

The instruments are designed for continuous operation 
without the necessity for routine overhaul, with continuous 
monitoring, adequate precautions and replacement of the 
filter no longer than every 5 years�

The most common source of failure for pneumatic 
instrumentation has been found to be inadequate air quality, 
allowing contaminants to block internal orifices� Air filtering is 
included within the instrument but cannot cope with sustained 
poor air quality, which may ultimately lead to failure�

The recommendations in the Pneumatic Installation section 
should be rigorously observed�

Note: These instruments are factory calibrated at a supply 

pressure of 30psig (2 bar).

The instrument cover must be unscrewed to obtain access to 
the trimpots�

Do not remove the instrument cover in a potentially explosive 
atmosphere when the instrument is powered�

An accurate current source of 4-20mA and pressure gauge are 
required� These should be of good quality with an accuracy of 
0�1% or better� The current source should be checked to ensure 
that it provides at least 6�5V at 20mA output compliance�

•  Connect the instrument as described in the installation 

section or the test-jack section below�

•  Remove the instrument cover to gain access to the 

trimpots and jack-socket�

•   Set the current to 4�00mA – the instrument outlet should 

be 3�00+/-0�05psig (0�200+/-0�003 bar)� Adjust the Zero 
trimpot if necessary�

• For 6-30 psig output, the output pressure should be set 

to 6�00 ±�05 psig (0�400 ± �003 bar)�  Adjust trimpot as 
necessary�

•   Set the current source to 20�00mA – the instrument outlet 

should be 15�00 +/-0�05psig (1�00+/-0�003 bar)� Adjust the 
Span trimpot if necessary�

•  For 6-30 psig output, the output pressure should be set 

to 30�00 ±�05 psig (2�00 ± �003 bar)�  Adjust trimpot as 
necessary�

If either Span or Zero controls are adjusted it may be 
necessary to repeat the above steps until both ends are within 
the calibration limits�

Alternatively the Jack Plug can be connected to calibrate and 
test the unit� The Jack Plug can be either set-up for Monitoring 
or Calibration/Operation set-up�

Содержание 4411

Страница 1: ...GE Oil Gas 4411 Model Masoneilan Electropneumatic Transducer Instruction Manual GE Data Classification Public ...

Страница 2: ...b GE Oil Gas 2015 General Electric Company All rights reserved ...

Страница 3: ...D REGULATIONS APPLICABLE AT THE SITE AND THE PARTICULAR REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET IN CONNECTION WITH INSTALLATION OPERATION OR MAINTENANCE SHOULD FURTHER INFORMATION BE DESIRED OR SHOULD PARTICULAR PROBLEMS ARISE WHICH ARE NOT COV...

Страница 4: ...ectrical Installation 4 Wiring and Cable Entry 4 Conduit Entry 4 Calibration 4 Tight Shut Off Adjustment Instructions 5 Simple Functional Checks 5 Technical Specifications 6 Performance 6 Potentially Explosive Atmospheres Markings 7 Instructions Specific to Hazardous Area Installations 8 Instructions Special Condition for Safe Use 8 FM Control Drawing 9 CSA Control Drawing 10 Table of Contents ...

Страница 5: ... The 4411 IP Transducer MUST BE installed put into service and maintained by qualified and competent professionals who have undergone suitable training Under certain operating conditions the use of damaged equipment could cause a degradation of the performance of the system which may lead to personal injury or death Changes to specifications structure and components used may not lead to the revisi...

Страница 6: ... units operate a closed loop system incorporating a feedback sensor ensuring long term stability and high accuracy performance with fail safe operation i e the output falls to a low pressure upon failure of the loop current These instruments combine substantial flow capacity with the ability to give precise control into closed volume dead end applications The instrument has been designed to withst...

Страница 7: ...e baffles must not be blocked with paint and or plastic sheeting etc Captured Bleed Version The baffles and the baffle cover are fitted to maintain the adequate Ingress Protection IP rating of the instrument Removal of these protective parts will invalidate the IP and the NEMA 4X rating of the instrument For captured bleed installation remove the baffle cover and unscrew both the baffles fit 1 8 N...

Страница 8: ...oof specifications must be used A ground terminal is provided both internally and externally and should be used if ground continuity is essential The unit is supplied with plastic blanking plugs which must be removed before operation calibration and replaced with a blanking plug conforming to the hazardous area certification rating applicable Calibration The instruments are designed for continuous...

Страница 9: ...output pressure is start up pressure 0psi adjust potentiometer slowly clockwise until the output pressure falls to zero Do not turn the pot beyond this point The shut off point is now set Shut off point check Increase the input signal by approximately 0 5mA e g to 3 8mA the output pressure will rise above 0psi Reset the input signal to the required shut off point e g 3 3mA and the output pressure ...

Страница 10: ... ISA 51 1 1993 N B Instrument accuracy excludes calibration errors Temperature Effect Span and Zero Mean temperature coefficient over full operating range 40 to 85 C less than 0 035 span degC Vibration 3 of span 4mm peak peak 5 15Hz 2g sine 15 150Hz Mounting Position Integral bracket allows for mounting in any orientation Long Term Stability Span and Zero Typically better than 0 25 span per year E...

Страница 11: ...Group BCD T6 Ta 75 C T5 Ta 85 C Class I II III Division 1 Group ABCDEFG T4 Ta 85 C Vmax 30Vdc Imax 110mA Ci 0 006µF Li 100µH Install as per Control drawing 2001 082 Class I Division 2 Group ABCD T6 Ta 75 C T5 Ta 85 C Dust Ingress Protection Class II III Division 1 Group EFG T6 Ta 75 C T5 Ta 85 C Suitable for Class II Division 2 Group FG T6 Ta 75 C T5 Ta 85 C and Class III Division 1 2 CSA Class I ...

Страница 12: ...utions e g regular checks as part of routine inspections or establishing from the material s data sheet that it is resistant to specific chemicals Not to be used with pure oxygen or oxygen enriched media as the process fluid Consult the supplier for approval certificates 8 Only approved cable glands are to be used which must maintain an Ingress Protection of IP66 9 Unused entry port hole must be b...

Страница 13: ...Masoneilan Model 4411 Electropneumatic Transducer Instruction Manual 9 2015 General Electric Company All rights reserved ...

Страница 14: ... 2015 General Electric Company All rights reserved ...

Страница 15: ...Masoneilan Model 4411 Electropneumatic Transducer Instruction Manual 11 2015 General Electric Company All rights reserved Notes ...

Страница 16: ...ax 7 8162 55 7921 Moscow Phone 7 495 585 1276 Fax 7 495 585 1279 SAUDI ARABIA Phone 966 3 341 0278 Fax 966 3 341 7624 SINGAPORE Phone 65 6861 6100 Fax 65 6861 7172 SOUTH AFRICA Phone 27 11 452 1550 Fax 27 11 452 6542 SOUTH CENTRAL AMERICA AND THE CARIBBEAN Phone 55 12 2134 1201 Fax 55 12 2134 1238 SPAIN Phone 34 93 652 6430 Fax 34 93 652 6444 UNITED ARAB EMIRATES Phone 971 4 8991 777 Fax 971 4 899...