In this chapter
This chapter contains the following sections:
See page
Section
6.1 Cleaning before planned service
6.2 Cleaning the instrument housing
6.6 Cleaning the flow cell and optical connectors
WARNING
Use only approved parts. Only spare parts and accessories that
are approved or supplied by GE may be used for maintaining or
servicing the product.
6.1
Cleaning before planned service
Cleaning before planned
maintenance/service
To ensure the protection and safety of service personnel, all equipment and work areas
must be clean and free of any hazardous contaminants before a Service Engineer starts
maintenance work.
Please complete the checklist in the On Site Service Health and Safety Declaration Form
or the Health and Safety Declaration Form for Product Return or Servicing, depending on
whether the instrument is going to be serviced on site or returned for service, respectively.
Copy the form you need from
Section 8.2 Health and Safety Declaration Form, on page 69
or print it from the PDF file available on the User Documentation CD.
56
Monitor UV-900 Operating Instructions 28962214 AD
6 Maintenance
6.1 Cleaning before planned service