4.1
Unpacking
Unpack the instrument and check the items against the supplied packing list. Check the
equipment for damage before starting assembly and installation. There are no loose
parts in the transport box. All parts are either mounted on the system or located in the
accessory kit box. If any damage is found, document the damage, and contact your local
GE representative.
It is recommended that all packing materials should be retained if onward transport of
the instrument is expected.
4.2
Site requirements
Requirement
Parameter
Indoor use
Operation site
Maximum 2000 m
Altitude
100/240 V AC ±10%, 50-60 Hz
Electrical power
Overvoltage category II
Transient overvoltage
4°C to 40°C
Ambient temperature
Stable laboratory bench or in ÄKTAexplorer or ÄKTApurifier.
Placement
20% to 95% relative humidity (noncondensing)
Humidity
2
Pollution degree
The instrument should be located in a place of low temperature variations, away from
heat sources, draughts and direct sunlight.
To ensure correct ventilation a free space of 0.1 m is required behind and in front of the
instrument. Do not use any soft material under the instrument, to ensure that the venti-
lation inlet in the front is not blocked.
The instrument should not be used in a corrosive atmosphere or in an atmosphere where
deposits are liable to form on the optical surfaces.
4.3
Transport
Before moving the equipment: disconnect all connected cables and tubing.
4.4
Assembly
The following parts must be added to Monitor UV-900 before use:
•
Flow cell
•
Optical fibers
Monitor UV-900 Operating Instructions 28962214 AD
31
4 Installation
4.1 Unpacking