
- 9 -
Cut off the link between 10 and 11 terminal. Operate exactly like that for current
relay to test operation current and return current, then step up AC current to the
tested operation current value, record the present voltage, universal meter can
be used to test the voltage between the two ends of J1
No brake
Starting ampere-turns test
It is not normal inspection item. Put in all the working winding 20 circuits,
connect the short-circuit of 10 and 11, input AC current from 3 and 8, input
contact operation signal from 5, 7 contact end, test like that for current relay.
The braking performance test
When make periodic inspection, just test Φ=0°and Action ampere-turns value when
Brake ampere-turns is 280
Содержание ZXJB
Страница 1: ...ZXJB Single Phase Relay Protection Tester ...