- 5 -
Turn on the power switch of the instrument, and the
instrument enters the process of initialization and self calibration.
3. Check power
When using the internal battery for power supply, the upper right corner
will display the battery capacity. If the battery capacity shows the red power
shortage sign, please charge it as soon as possible before continuing to use.
This instrument can be used while charging, but the charging time will be
greatly extended.
4. Start measuring
1) When the power is turned on, the instrument will initialize automatically.
After self calibration, it will enter the measurement state automatically.
2) Confirm that the high-precision control valve on the instrument is closed,
and test the quick plug of the pipeline.
3) Connect the other end of the test pipe to the air supply port (or test port) of
the equipment to be tested.
4) At this time, adjust the control valve on the front panel of the solar term
before adjusting the gas flow rate.
Содержание ZXCD SF6
Страница 1: ...ZXCD SF6 Purity Analyzer ...