      1           Safety Precautions                                                                                  3        
 
      2          Wiring Requirements                                                                              4 
 
      3          Installation details                                                                                7-14 

                         Operator Dimensions                                                                              

               

     Mechanical Installation/Mounting detail 

                         Control board layout 
                         Electrical Connections/Programming 
                         Trouble shooting 

      

 

 

 

      4           Manual release                                                                                       14 
 
    

  

        

Maintenance details                                                                               15 

 
      6          Warranty                                                                                                  10       

 
 
 
 
 
 
 
 
 
 
 

Содержание GDS DRIVE 500

Страница 1: ...Installation and Maintenance Manual Domestic Sliding Gate Operator MODEL GDS DRIVE 500 A B N 62 059 806 405 Nov 2016 V1 00 ...

Страница 2: ...ons 3 2 Wiring Requirements 4 3 Installation details 7 14 Operator Dimensions Mechanical Installation Mounting detail Control board layout Electrical Connections Programming Trouble shooting 4 Manual release 14 5 Maintenance details 15 6 Warranty 10 ...

Страница 3: ...y necessary signs to indicate any danger areas and automatic operation of the gate or door The operators are not designed to be used in any hazardous areas or areas subject to flooding etc All electrical connections and wiring must be performed with AS NZS 3000 2007 as the guidelines Or its counterpart for other countries outside of Australia and New Zealand WARNING ELECTRICITY CAN KILL The manufa...

Страница 4: ...removing the 240vac transformer and following wiring set up for solar connection The power supply transformer can be removed and installed in an IP rated enclosure and mounted away from the gate operator This is done sometimes where mains power is not available or it is impractical to run mains power to the site The operator can be supplied with a separate power supply upon special order Then all ...

Страница 5: ...nting plate to concrete pad using 10mm x 100mm dynabolts 7 If the anti tamper bar is to be used follow the steps below 8 Or position the operator base plate back in positon and bolt down to the concrete Now you can positon the operator in the best position to suit the gate rack by starting at one end loosely hold a piece of rack on top of the pinion and gently against the gate rail then slide the ...

Страница 6: ...6 Guide to fitting anti tamper bracket ...

Страница 7: ...actuators 1 The operator has been set up at the factory to close to the left when looking from the inside of gate looking out so firstly if you re gate closes to the right swap over the white and brown wires on the lc and lo or Limit close and Limit open limit connection plugs Also you will need to swap over the blue and black motor wires ...

Страница 8: ...or approx 20mm forward from this position this will then give you a more accurate final position for the bracket to allow for run on of the gate Make sure you drill between the valleys of the rack and mount using the supplied 5mm stainless bolts shown above Do the same for the open limit actuator Once the operator is running you can slide the actuator across to fine tune the final stopping positio...

Страница 9: ...9 Control Board Layout Programming ...

Страница 10: ...10 ...

Страница 11: ...11 ...

Страница 12: ...12 ...

Страница 13: ...13 ...

Страница 14: ...14 ...

Страница 15: ... the door out to release for manual operation To lock the gate back into automatic operation move the gate to around the half way positon push the lever back in then lock off in position with the key The first operation will be a slow close so it re learns its positioning Normal operation will resume ...

Страница 16: ... good condition Gate stops are installed and in good condition not loose Gate rack is tight correct clearances between pinion wheel rack Gate track is not damaged Gate operator mounting bolts tight No oil leaks from gearboxes Inside operator and control box clean Baygon Surface Spray around operator not on electronics All electrical connections tight Check battery charge voltage correct Unplug mai...

Страница 17: ...ING CIRCUMSTANCES i IF NO PROOF OF DATE OF PURCHASE CAN BE PRODUCED ii IF THE PRODUCT HAS BEEN USED IN A MANNER BEYOND ITS DESIGN PARAMETERS iii IF THE PRODUCT IS TAMPERED WITH OR REPAIRED BY PERSONNEL NOT AUTHORISED TO DO SO iv IN RESPECT OF LOSS OR DAMAGE CAUSED BY ROUGH TREATMENT v IF THE PRODUCT IS NOT USED AND MAINTAINED IN ACCORDANCE WITH INSTRUCTIONS OR RECOMMENDATIONS LISTED IN THIS INSTAL...