background image

 

 

Keep loose clothing and hands clear of the gate whilst in operation or potentially able to be operated.

 

 

The installer should provide all information concerning the use of the automation equipment as well as 
instructions regarding the manual override and maintenance procedures to the users of the system. 

 
 
2.

             

W

IRING 

R

EQUIREMENTS

 

 

 

Single phase 240v 10A non-earth leakage protected power supply to where operator is mounted. 

*This is required because inverter VSD drive units inherently allow an earth leakage current to 
flow.   This current is minimal but a non RCD protected circuit must be installed and the method 
of installation done so in accordance AS/NZS 3000:2007 to comply. 
A connection made to an earth leakage protected circuit may cause nuisance tripping. 
 

 

Extra Low Voltage cables from operator for access control. (Shielded cable if over 8m runs).

 

                                                                                                                                       

 

3.

            

I

NSTALLATION DETAILS

 

 

After reading the previous sections in this manual, and having checked for suitable installation, proceed as 
follows:- 

  

Electrical Cabling 
 

 

A suitably rated Isolator and 240v power supply should be available near to where the gate operator is to 
be mounted. The following diagrams will provide measurements for the positioning of conduits and the 
appropriate position for mounting the operator.

 

 

When  bringing  power  and  control  cables  into  the  control  enclosure  inside  the  operator, 
please leave enough slack in the cables, in this way, the enclosure can still be lifted up in 
order to see and work on the controls easier.  To lift up control enclosure, undo wing nut 
on right hand side, once lifted up, re tighten the nut to keep enclosure in upwards position, 
once finished, undo nut, drop enclosure back down, then re tighten wing nut.

 

 
 

Mechanical Installation 

 

Ensure gate rolls easily and has been installed in a manner where there is no excessive friction or binding 
occurring. 

 

A concrete base approximately 600mm long x 300 wide x 300mm deep should be laid where the gate 
operator is to be located. 

 

IMPORTANT

 ensure there are gate stops firmly installed in the fully open and closed positions.  These 

stops need to be engineered and installed such that they will be strong enough to stop the gate should the 
limits fail at any time. 

 

Remove  the  gate  operator  cover  and  position  mounting  plate  and  operator  in  approximate  mounting 
location. 

 

Dynabolt or chemical anchor the bottom mounting plate to the concrete mounting pad using 12 x 100mm 
fixings. 

 

Unscrew anticlockwise the manual disconnect knurled knob so the drive gear free wheels.  

 

 
Electrical Connections 
 

 

Connect a non earth leakage protected 10A 240v supply to Din Rail terminals labelled A & N, Connect 
earth to the earth Din Rail terminal.  

 

Conduits for power & control need to preferably come up through 3x25mm holes. 

 

 
 

 

 
 

Содержание 630 CH

Страница 1: ...1 Installation and Maintenance Manual Chain Slider Gate Operators Inbuilt Models GDS 630 CH GDS 630 CH HD Made in Australia from Australian quality imported components A B N 62 059 806 405 July 2014...

Страница 2: ...lation 9 13 Electrical Cabling Mechanical Installation Electrical Connections Plan view layout conduit positions CB6 Control Board layout CB 6 Control inputs mode settings 4 Variable Speed Drive VSD 1...

Страница 3: ...e through the full travel to check the gate is not bent to the extent that the gate hits the operator and has ample clearance through it s full travel Check the height of the operator compared to the...

Страница 4: ...re the chain adjuster rods are level with the bottom teeth of the idler sprockets Fit the spacer support tubes for the chain to rest on along the length of the gate at approximately 1m spacing s and a...

Страница 5: ...ver the drive sprocket and under the other idler sprocket on the chain drive operator The chain can then be connected to each of the chain adjuster connector rods this is done by using the 4mm high te...

Страница 6: ...t indicator led s turn off when the corresponding limit switch is activated If they are the wrong way around swap the op and cl limit wires around To commission the gate move the gate to approximately...

Страница 7: ...and ramp times Automation settings operating modes can be adjusted via the CB6 board refer to manual for further instructions Once Inverter settings are appropriately set proceed to make final adjustm...

Страница 8: ...and any other safety devices to protect both equipment and personnel Extra caution should be employed when using operator in auto close mode Display any necessary signs to indicate any danger areas an...

Страница 9: ...When bringing power and control cables into the control enclosure inside the operator please leave enough slack in the cables in this way the enclosure can still be lifted up in order to see and work...

Страница 10: ...10 PLAN VIEW LAYOUT CONDUIT POSITION FRONT VIEW R H S VIEW TOP VIEW OF BASE CHASSIS...

Страница 11: ...r 7 Motor 2 Limit Switch Inputs not shown 8 Terminals for Isolated 24vAC Supply 21 Firmware Version Label for Limit Switch and Control Inputs 22 Light Control Relay Interface 9 Pedestrian Access Contr...

Страница 12: ...not exceed 30V A C D C 5Amps If an electromagnetic lock is used change one wire on the control board lock output to the normally closed output Use the light relay module if fitted to switch the applie...

Страница 13: ...a pre set pedestrian access time of 5 seconds which is intended to open the motor connected to M1 output only part way If these default times do not suit your needs simply use the procedure below to a...

Страница 14: ...nal MI2 Reverse close command input linked to MI3 for speed setting Terminal MI3 Closing Speed Multi Step speed command input Terminal DCM command output terminal used for common PARAMETER NUMBER PARA...

Страница 15: ...se led should start to flash if they are the wrong way around turn power off to the operator wait until the inverter powers down then swap over any 2 of the motor phase wire at the inverter Turn power...

Страница 16: ...16 6 CONTROL DIAGRAMS...

Страница 17: ...pened by hand To re engage the clutch move the gate by hand Into approx The half way position and turn the Knurled knob clockwise until it is very tight If when turning the knurled knob clockwise and...

Страница 18: ...y to ensure operator will not run inadvertently Gate rolls freely when in manual Gate wheels and guide rollers in good condition Gate stops are installed and in good condition not loose Gate chain is...

Страница 19: ...ing circumstances i If no proof of date of purchase can be produced ii If the product has been used in a manner beyond its design parameters iii If the product is tampered with or repaired by personne...

Отзывы: