background image

7

www.greenerblast.com

Emergency 

Shut-Off

Surface Rinse

Pot Pressure 

Regulator

Pot Pressure

Abrasive

Metering

Blast Pressure 

Regulator

Blast Pressure

Air Supply

Pot Fill

Switch

Control Panel

Содержание G20074

Страница 1: ...OPERATION MANUAL...

Страница 2: ...1 855 9GO GBTI info greenerblast com greenerblast com...

Страница 3: ...lt in harm or serious Injury Greener Blast Technologies Inc does not in any way promote or recommend the use of potentially hazardous or unsafe materials These include but are not limited to silica sa...

Страница 4: ...Filling Pressurizing Blast Vessel 8 Setting Pot Pressure 9 Setting Blast Pressure 9 Max Blast 10 Emergency Shut Off 10 Operating the Machine 10 Rinsing Function 11 Surface Blow Down Function 11 Impor...

Страница 5: ...f operator error becomes responsibility of the owner operator at factories discretion This warranty does not include wear parts including but not limited to ball valves hoses etc All warranty claims a...

Страница 6: ...Down Valve Certified Lifting Lugs Air Purge Valve 100 Gallon On Board Water Tank Lifting Pockets Main Pot Shutoff Slurry Hose Control Panel Relief Valve ASME Rated Inspection Cover Hand Hole Front Ba...

Страница 7: ...7 www greenerblast com Emergency Shut Off Surface Rinse Pot Pressure Regulator Pot Pressure Abrasive Metering Blast Pressure Regulator Blast Pressure Air Supply Pot Fill Switch Control Panel...

Страница 8: ...table water tank clean and grit free at all times 3 Close blow down valve Use water captured in pail to fill the blast pot with water up to the top outer rim of the blast pot 4 Open air purge valve an...

Страница 9: ...ator activate the dead man control and dial the blast pressure in to the target setting Remember this is 25 30 psi lower than where you set the pot pressure to in the previous step While blasting blas...

Страница 10: ...n now shift the main pot shut off slurryhose ball valve to the open position Activate the machine with selector switch in the pot fill position until material begins to exit the hose This will jump st...

Страница 11: ...ou are not blasting for any extended length of time the main pot slurry valve MUST be closed This is especially critical when the compressor is shut down Blast hose will fill with the remaining blast...

Страница 12: ...8 of this manual 6 At this point you should be able to switch the selector switch to blast and go back to work without readjusting pot blast pressures Blast Media Options Blast Media Lbs Per Cubic Fo...

Страница 13: ...get it cycling again Pump is cycling erratically Air was not completely relieved from pot Machine won t develop any blast pressure If compressed air supply is deemed sufficient the blast pressure reg...

Страница 14: ...from the system before disconnecting your supply line Overnight Short term 1 Simply close off the Slurry Hose main pot valve 2 Turn off your air supply and open system air purge Pot can remain pressur...

Страница 15: ...st Technologies Inc 6 Reconnect Slurry Hose main pot shutoff valve 7 Your machine is now fully decommissioned and ready for long term storage Using Rust Inhibitor Steel Only Use rust inhibitor of choi...

Страница 16: ...Get in touch with Greener Blast today 1 855 9GO GBTI info greenerblast com greenerblast com...

Отзывы: