Page 5 - 25
Operations
Orbit™ 2000 Operation and Maintenance Manual
© GBC Films Group January 2001
5/
Position the roll of film on the spool arbor ( c ) with respect to the adhesive side (Poly-in or Poly-
out). Refer to Section 6 Applications.
c
f
6/
Replace the control side conical cone ( f ) on the operator’s side and leave the 8 mm screw
loose for movemt.
7/
Measure from operators side/ side frame to paper pile left margin ( a ). Always add 1/8 in.
( 3.17 mm ) to this measurement. Use the measurement just obtained, with the 1/8 in ( 3.17 mm )
addition, to measure the edge of the film ( b ) on the spool arbor to the operators side/ side frame.
X + 1 0 m m
X + 3 /8 in .
5 m m
X
a
b