Operation
F-60 Operation and Maintenance Manual
3-16
© GBC Pro-Tech 1998 July
352&(66&21752/&+$57%
Product: __________________
Process: Mount & Hot Overlaminate (Second Pass) Date: ________________
352&(66&21752/',$*5$0%
Mount and Hot Overlaminate (Second Pass)
☞
NOTE
Guard is removed for this operation. Use footswitch to load, then accelerate materials through rolls.
FRONT CONTROL SETTINGS
Speed : 0-6 fpm (0-180 cpm)
Reverse/Forward: Forward
Roll Pressure: Trial
Top Heater: 32-105 ºF (0-40 ºC)
Cooling: Off
Bottom Heater: 32 ºF (0 ºC)
Hold
Encapsulated
Image
Release Liner
(Peel prior to nip)
Foam
Core
Содержание Laminator
Страница 1: ......
Страница 2: ......
Страница 12: ...Safety F 60 Operation and Maintenance Manual 1 6 GBC Pro Tech 1998 July Blank page...
Страница 42: ...Warranty F 60 Operation and Maintenance Manual 5 2 GBC Pro Tech 1998 July Blank page...
Страница 44: ...Specifications F 60 Operation and Maintenance Manual 6 2 GBC Pro Tech 1998 July Blank page...