background image

 © 2004 General Binding Corporation

Spartan Operation and Maintenance  Manual

Page 6-3

6.3 Lamination pouches

INFORMATION: Treat the pouch carriers carefully
as they  may be reused until you see wrinkles in the
lamination.

1.

 Turn the laminator on.

2.

 Center the lamination pouch between the two sheets

of the pouch carrier.

Pouch carrier

Lamination
pouch

3.

 Fold the top sheet of the pouch carrier and the

lamination pouch over.

4.

 Center the image on the lamination pouch and carefully

lay the top sheets back over the image.

Pouch carrier

Lamination pouch

Image

5.

 Set the pressure handle to the lamination position.

6.

 Wait for READY to illuminate.

7.

 Press RUN.

  +  

8.

 Align the leading edge of the pouch carrier containing

the lamination pouch and image slightly off center of the
table.

9.

 Gently slide the pouch carrier into the roller nip until

you feel the rollers catch the pouch carrier.

10.

 As the pouch carrier nears its end, be prepared to

catch the pouch carrier as it exits the rear of the laminator.

11.

 Press STOP and set the pressure handle to the roller

release position.

  +  

Содержание 930-073

Страница 1: ...L 60062 4195 SPARTAN LAMINATOR OPERATION MAINTENANCE MANUAL 2004 GENERAL BINDING CORPORATION ALL RIGHTS RESERVED Do not duplicate without written permission REA DY U U S G S P R G E A L AMIN AT E O AM...

Страница 2: ...ducts described in it without notice All specifications and information concerning products are subject to change without notice Reference in this publication to information or products protected by c...

Страница 3: ...3 2Function 3 1 3 3 Electrical 3 1 3 4 Dimensions and weights 3 1 Figure 3 4 1 Dimensions 3 2 4 0 Installation 4 1 Pre installation 4 1 4 2 Suggested floor layout 4 2 Figure 4 2 1 Suggested floor layo...

Страница 4: ...2004 General Binding Corporation Spartan Operation and Maintenance Manual Page II...

Страница 5: ...ion following this symbol is to inform you of how to avoid a dangerous situation ELECTRICALHAZARD Thissymbolisusedprior to a step The information following this symbol is to prevent an electrical shoc...

Страница 6: ...stand a label consult your manager for assistance Electrical Shock Electrical shock hazard Electricalvoltagebehindpanel MUCHO CUIDADO Riesgo de choque electrico No abra Adentro no hay piezas reparable...

Страница 7: ...ING ATTENZIONE WARNUNG Electrical shock hazard Do not open No user serviceable parts inside Refer servicing to qualified service personnel Kans op elektrische schok Niet openen Bevatgeen door gebruik...

Страница 8: ...2004 General Binding Corporation Spartan Operation and Maintenance Manual Page 1 4...

Страница 9: ...authorized customer alterations will void this warranty THE WARRANTY MADE HEREIN IS IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY WARRANTY OR MERCHANTABILITY OR FITNESS FOR A PART...

Страница 10: ...2004 General Binding Corporation Spartan Operation and Maintenance Manual Page 2 2 This page intentionally left blank...

Страница 11: ...Motor DC gear motor Heating Preset for GBC materials Controls Operationscontrolpanel Roll Design Highreleasesilicone 3 3 Electrical Laminator Rating 240V 60 Hz 2500 W Requirements 230 240 VAC 60 Hz s...

Страница 12: ...004 General Binding Corporation Spartan Operation and Maintenance Manual Page 3 2 Figure 3 4 1 Dimensions 42 in 105 cm RE ADY U U S G S P R G E A LAM IN AT E O AM PO UC H R E 53 in 132 cm 18 5 in 46 c...

Страница 13: ...flow Figure 4 1 4andFigure4 1 5illustratesatypicalmachine arealayout Istheenvironmentappropriateforthelaminator The laminator requires a clean dust and vapor freeenvironmenttooperateproperly Itmustnot...

Страница 14: ...with thematerialsathandwhilebeingfreetomovearoundthe laminatorwithoutinterferencefromthelaminator Refer tothefigurebelowforasuggestedfloorlayoutexample Figure 4 2 1 Suggest floor layout example 18ft 5...

Страница 15: ...H R E Rear Front Control side Drive side Parts on the laminator READY U U S G S P R G E A LAM IN AT E O AM PO U C H R E Cover Cabinet Table Stand Pouch rack Board rack Castors Under the cover R E A D...

Страница 16: ...tthemachineforanyobviousshipping damages upon receipt 2 Carefully unwrap the shrink wrap from around the laminator CAUTION Do not use a knife or other sharp object to remove any shrink wrap from aroun...

Страница 17: ...r runandmotorstopfunction Figure 5 1 1 Control panel READY SPARTAN GBC Run switch Stop switch Run indicator Ready indicator RUN When pressed engages the motor that drivestherollers INFORMATION The lam...

Страница 18: ...isrequired Thisisthemaximumnipopening position Foam pouch position Usethispositionwhenusingboardtypematerialsthrough the laminator This nip opening and speed is preset for GBCmaterials Laminatingposit...

Страница 19: ...empurature reach correct operating tempurature The top roll sensor only reads the top roll and the bottom roll may not be the correct tempurature 6 1 Pouch boards 1 Turnthelaminatoron 2 Center the ima...

Страница 20: ...to the foam pouch position 4 WaitforREADYtoilluminate 5 Press RUN 6 Aligntheleadingedgeofthemountingboardslightly off center of the table 7 Gentlyslidethemountingboardintotherollernipuntil you feel th...

Страница 21: ...over 4 Centertheimageonthelaminationpouchandcarefully lay the top sheets back over the image Pouch carrier Lamination pouch Image 5 Set the pressure handle to the lamination position 6 WaitforREADYtoi...

Страница 22: ...achine2 3times to help cool the bottom roller Laminating Pouches Toreducewavingaffect matchthesizeofthepouchas close to the image size as possible This will allow the stressesontheenvelopetobemoreeven...

Страница 23: ...ntain clean and adhesive free nip rollers and overall cleanlinessofthelaminatoritself ELECTRICAL HAZARD Do not use liquid or aerosol cleaners on the laminator Do not spill liquid of any kind on the la...

Страница 24: ...pick or pull heat activated adhesive off the rolls when they are cold You can cause irreparable damage to the laminating rolls CAUTION The following procedure is performed while the laminator is HOT U...

Страница 25: ......

Страница 26: ...General Binding Corporation One GBC Plaza Northbrook IL 60062 4195...

Отзывы: