![GBC 54C Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/gbc/54c/54c_installation-and-operation-manual_3873898017.webp)
Page 5-3
SPIRE II Series
– Installation and Operating Instructions
m
aIn
r
ollers
Figure 8. Top and bottom Main Rollers.
WARNING
: Keep your hands and fingers
away from the point between the two Main
Rollers (nip point). Do not operate when alone. More
than one person is required to be in the area when
operating. Failure to observe this warning could
result in severe personal injury.
If entrapment between the Main Rollers occurs, use
the Emergency Stop Switch.
Emergency Stop Switches
The Emergency Stop Switches are located on all four
upper corners of the machine.
Turn the Gap/Pressure Crank clockwise to raise the
Top Main Roller and release the pressure.
a. a
nd
B. m
aIn
r
ollers
The Top (A) and bottom (B) Main Rollers pull the
media into the laminator and laminates the film onto
the media.
G
ap
/p
ressure
c
rank
Figure 9. Gap/Pressure Crank.
The Gap/Pressure Crank sets the Main Roller gap.
Turn the handle counterclockwise to lower the Main
Roller to increase the roller pressure.
F
ootsWItch
J
ack
The Footswitch jack is located directly below the
Gap/Pressure Crank (partially visible in the above
photo). To connect the Footswitch, align the slot in
the cable connector with the key at the top of the
jack, press the connector in, and then screw the
collar to secure.
Содержание 54C
Страница 4: ...SPIRE II Series Installation and Operating Instructions Page iii...
Страница 10: ...SPIRE II Series Installation and Operating Instructions Page 2 2...
Страница 38: ...SPIRE II Series Installation and Operating Instructions Page 6 14...
Страница 43: ...Page 7 5 SPIRE II Series Installation and Operating Instructions Notes Date Note...