© 2006 General Binding Corporation
Page 3
GB
TABLE OF CONTENTS
Description
Page
No.
Cover
Legal Disclaimer
Table of Contents
Important Safety Instructions
Important Safeguards
General
Electrical
Warranty
Limited 90-Day Warranty
Specifications
FCC Note
Installation
Prior to Installation
Installation
Features Guide
Top Film Supply Shaft
Release Liner Take-up
Idler Bar
Pressure Rollers
Nip Point
Feed Table
Safety Sensors
Emergency Stop (Artic Titan 1064 WF c)
Table Interlock Latch
Bottom Film Supply Shaft
Film Web
Core Adaptors
Tension Adjustment Knobs and Motor
Print Clamp (Artic Titan 1064 WF c)
Control Panel
Power Switch
Operation
General Operation
Loading Film
Removing and Installing the Print
Clamp (Artic Titan 1064 WF c)
1
2
3
4
4
5
5
6
7
8
8
8
9
9
9
9
9
9
9
10
10
10
11
11
11
12
12
13
14
14
15
16
Removing and Installing the Feed
Table
Loading Film onto the Supply Shaft
Loading Film with a Threading Card
Loading Film by Tacking New Film to
Existing Film
Decaling in Two Passes
Mounting
Tips for Threading Pressure Sensitive
Adhesive (PSA) Film
Pre-Treating Boards
Mounting Only
Film Alignment and Tension
Film Alignment
Film Tension
Artic Titan 1040 WF c Rewinder
Testing the Web
Clearing a Film Jam (Wrap-up)
Laminating Guide
Operator Maintenance
Caring for the Artic Titan 1040 WF c or
Artic Titan 1064 WF c Laminator
Cleaning the Rollers
Troubleshooting
16
17
19
20
21
22
22
22
22
22
22
23
23
24
24
24
25
25
25
26