Page i
Operating Instructions
27C
1. Safety
Warnings .................................................................
1-1
General ....................................................................
1-1
Electrical ..................................................................
1-2
2. Warranty
Limited 90-Day Warranty ........................................
2-1
3. Specifications
FCC Note ................................................................
3-2
4. Installation
Prior to Installation .................................................
4-1
Installation ..............................................................
4-1
5. Feature guide
Top Film Supply Shaft ............................................
5-1
Release Liner Take-up ..........................................
5-1
Idler Bar ..................................................................
5-1
Pressure Rollers .....................................................
5-1
Nip Point ................................................................
5-1
Safety Shield ..........................................................
5-1
Feed Table ..............................................................
5-2
Table Interlock Latch .........................................
5-2
Bottom Film Supply Shaft ................................
5-2
Film Web ................................................................
5-2
Core Adaptors ..................................................
5-2
Roller Pressure Handle .........................................
5-2
Film and Take-up Tension Adjustment Knobs ...
5-3
Control Panel .....................................................
5-3
POWER SWITCH ....................................................
5-4
6. Operation
General Operation ..................................................
6-1
Loading Film ...........................................................
6-2
Removing and Installing the Safety Shield ........
6-3
Removing and Installing the Feed Table ...........
6-3
Loading Film Onto the Supply Shafts ................
6-4
Loading Film with a Threading Card .................
6-6
Loading Film by Tacking New Film to Existing Film
6-7
Decaling in Two Passes .........................................
6-8
Mounting ...............................................................
6-10
Tips For Threading Pressure Sensitive Adhesive
(PSA) Film .........................................................
6-10
Pre-Treating Boards ..........................................
6-10
Mounting Only ..................................................
6-10
Film Alignment and Tension ..................................
6-10
Film Alignment ..................................................
6-10
Film Tension ......................................................
6-11
Testing the Web ............................................
6-11
Clearing a Film Jam (Wrap-up) .........................
6-12
Lamination Guide .................................................
6-12
7. Operator Maintenance
Caring for the 27C Laminator ..................................
7-1
Cleaning The Rollers ...........................................
7-1
Troubleshooting ......................................................
7-2
T
ABLE
OF
C
ONTENTS
Содержание 27C
Страница 3: ...Operating Instructions Page 2 27C...
Страница 5: ...Operating Instructions Page ii 27C...
Страница 8: ......
Страница 9: ...Operating Instructions Page 2 2 27C...
Страница 13: ...Operating Instructions Page 4 2 27C...
Страница 32: ...Page 7 3 Operating Instructions 27C...
Страница 33: ......