ZZZ-209.W1209-32.1129-17.GP.EN.HER
HER-HL 3
ASSEMBLE PIECES
BEFORE SCREWING
THEM TO THE WALL
STEP #4
Set polycarbonate exposed side on the outside over horizontal left guide I-3, use one (1) Rr-3 panel, one (1)
P-3 joint and one (1) Ss-3 panel, then do the right side with one (1) Tt-3 panel, one (1) Q-3 joint and one (1)
Uu-3 panel over the J-3 horizontal panel. Secure P-3 and Q-3 to I-3 and J-3 respectively with self-tapping
screws (PQ-3).
NOTE:
Once the wall track is in place,
apply silicon along the top of the
wall track and at the joint of the
two tracks.
Silicon
is
not
supplied.
STEP #3
Assemble ML-3, N-3, O-3, and MR-3 as shown
and position evenly above vertical guides, at 96’’
from the ground. Secure wall track and vertical
tracks to brick or cement wall by drilling through
the aluminum and using screws Xx-3. Insert the 2
horizontal guides, I3 & J3 at the top of the frame.
Make sure the 2 frames are at the correct level, if
not, use shims to compensate. Do not use tools to
force.
Содержание W1209 1/2-32
Страница 13: ...ZZZ 209 W1209 32 1129 17 GP EN HER HER HL 13...