background image

ZZZ-209.W1209-32.1129-17.GP.EN.HER      

 

     HER-HL           12 

 

 

DESCRIPTION 

QTY 

DRAWING 

DESCRIPTION 

QTY 

DRAWING 

10-518 

REGULAR ROOF 

CROSSBAR 

Kk-3 

 

10-519 

ROOF TOP 

REINFORCE 

Ll-3 

 

10-520 

ROOF TOP 

REINFORCE 

Mm-3 

 

08-134 

UPPER DOOR 

RAIL END CAP 

Nn 

 

 

08-135 

SCREW 

Oo-3 

 

 

12-149 

(63 ¼ x 24 ½”) 

LEFT+RIGHT 

ROOF PANEL 

Pp-3 

 

12-150 

(63 ¼ x 23”) 

REGULAR ROOF 

PANEL 

Qq-3 

 

12-151 

LEFT BACK 

GABLE PANEL 

Rr-3 

 

12-152 

LEFT FRONT 

GABLE PANEL 

Ss-3 

 

12-153 

RIGHT BACK 

GABLE PANEL 

Tt-3 

 

12-154 

RIGHT FRONT 
GABLE PANEL 

Uu-3 

 

10-527 

LEFT WALL 

GUIDE 

Vv-3 

 

10-528 

RIGHT WALL 

GUIDE 

Ww-3 

 

10-529 

SCREW FOR 

FIXING TO 

WALL 

Xx-3 

18 

 

10-530 

REGULAR TOP 

FILLER 

Yy-3 

 

10-531 

END TOP 

FILLER 

Zz-3 

 

12-047 

BOLT 

Ww 

12 

 

13-045 

SELF-TAPPING 

SCREW 

PQ-3 

 

 

 

 

 

Содержание W1209 1/2-32

Страница 1: ...SOLARIUM ASSEMBLY INSTRUCTIONS DO NOT DESTROY THE BOXES UNTIL COMPLETELY ASSEMBLED Assembly by more than one person is suggested Requires 96 clearance at the wall Base Dimensions 144 x 118 Largest Dim...

Страница 2: ...when open Ensure frames A 3 are at the front of the sides Use E3 between frame ends and use two 2 K3 joints for corners NOTE When placing the door frame opening make sure the inserts on the frame are...

Страница 3: ...respectively with self tapping screws PQ 3 NOTE Once the wall track is in place apply silicon along the top of the wall track and at the joint of the two tracks Silicon is not supplied STEP 3 Assembl...

Страница 4: ...through joint K 3 with the Bb 3 screw Secure to Q 3 bracket with self tapping screw PQ 3 Repeat on left side with rafter S 3 STEP 6 Set U 3 rafters over the middle of each panel with Bb 3 screws at th...

Страница 5: ...should go first and last with the Qq 3 panels in between STEP 8 Insert the aluminum middle roof joint between the rafters making sure the slotted holes are at the bottom Slide into upper and lower gro...

Страница 6: ...een the panels and gently tap on the panel to guide it into the aluminum groove Use a spatula if needed to make it fit Insert two 2 Pp 3 on either end then insert the Qq 3 panels STEP 10 Starting at e...

Страница 7: ...he 2 ends and Mm 3 between panels Lastly assemble crossbeam L 1 and L 2 then secure to rafters using bolts Cc 3 Make sure screws are manually tight STEP 12 DOOR UNIT S MUST BE ASSEMBLED INSIDE OF SOLA...

Страница 8: ...the door opening by screwing at the top First use bolts Ww and washers Gg 3 on the inside and female bolts Cc 3 2 on the outside for the top assembly See diagram below Attach lower track with bolts C...

Страница 9: ...or pull to one side making sure that locking pin is not locked then remove panels gently panels are easy to remove NOTE This unit is not waterproof For best protection against rain close the windows o...

Страница 10: ...SLIDING DOOR FRAME D 3 2 11 544 CONNECTING PIECE E 3 12 11 545 TOP DOOR RAIL F 3 2 11 546 BOTTOM DOOR RAIL G 3 2 08 138 PLASTIC STOPPER H 3 4 12 142 LEFT SIDE RECEIVER I 3 1 12 143 RIGHT SIDE RECEIVER...

Страница 11: ...U 3 5 10 513 MIDDLE ROOF JOINT V 3 2 10 514 MIDDLE ROOF JOINT W 3 4 10 515 EDGING X 3 2 10 516 EDGING Y 3 4 08 156 SCREW Z 3 10 08 158 BOLT Bb 3 28 08 161 BOLT Cc 3 23 12 037 FEMALE BOLT Cc 3 2 12 08...

Страница 12: ...8 12 149 63 x 24 LEFT RIGHT ROOF PANEL Pp 3 4 12 150 63 x 23 REGULAR ROOF PANEL Qq 3 8 12 151 LEFT BACK GABLE PANEL Rr 3 1 12 152 LEFT FRONT GABLE PANEL Ss 3 1 12 153 RIGHT BACK GABLE PANEL Tt 3 1 12...

Страница 13: ...ZZZ 209 W1209 32 1129 17 GP EN HER HER HL 13...

Страница 14: ...r Service Department for a complete schedule of replacement parts and prices CONDITIONS FOR EXERCISING THE WARRANTY The warranty only applies to the original purchaser with the bill In order to proper...

Отзывы: