STEP 5
STEP 6
STEP 5
STEP 7
STEP
5. COVER INSTALLATION
(Ties are always on the inside)
a) Place the roof in front of the shelter as illustrated.
b) Unfold as illustrated then lift onto shelter as is.
c) Place cover over the completed structure making sure that the TRIANGLE is at the front of the garage.
d) Lace rope through grommets and around pipes tightly going completely around the shelter. Grommets are
placed in the upper corner of each door. Put the remaining cord through these grommets and secure to the
ground with nails.
e) Tie inside ties firmly to bars.
6. DOOR ASSEMBLY
a) Take one door with shiny side facing outside placing on to hooks (M).
b) Repeat a) for the remaining doors.
c) Take an elastic, put it through one of the grommet holes on the door from the inside out. Take S hook, place
it on the elastic and squeeze one end with a pair of pliers so it locks on the elastic. Repeat until all the elastics
are done, and then use the open end to hook on the grommet band on the side of the roof.
7. SHELTER REINFORCEMENT
a) Place your garage in the final position you want then close the front and back doors (if supplied) before
anchoring. Anchor with brackets (06-394) and anchor rods (06-410). Drive anchor into ground.
b) Fix flap to your house (if applicable). The structure has to be anchored on a flat leveled surface
as asphalt, concrete, etc. Additionnal anchors are not included.