![Gazebo penguin 41218MR-12 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/gazebo-penguin/41218mr-12/41218mr-12_assembly-instructions-manual_570506013.webp)
ZZZ-184.41218MR.0312-21.GP.EN.doc
WEB VERSION
13
Assembly Instructions
12x18 Solarium
Pre-assembled steel angle (Z1, Z2, and Z3) to roof Rafters (K, L, Xx) respectively using
Bolts (Bb)
To Be Assembled Before Packing
4 Steel Angles (Z1) to be attached to the right hole
and remaining 4 to the left hole.