ZZZ-184.41218.1116-20.GP.EN.doc
WEB VERSION
6
Step 2:
1. Place a bolt (Ww) and washer (Gg) through the top door rail (F) and door frame, and a
female bolt (Cc-2) from the other side. Once all are inserted, tighten them all securely.
2. Secure bottom door rail (G), using a bolt (Cc) and washer (Gg).