3. TRANSPORT/ERECTION OF THE MACHINE
3.1 UNPACKING, CLEANING
Check the machine and tools to rule out transport damage.
Make sure that machine and tools are complete by comparing with the delivery and order notes.
3.2 PREPARING THE SET-UP
3.2.1 SPACE REQUIREMENTS
The UNIPRESS 4 requires a footprint of app. 700 mm width and 550 mm depth on top of a stable rest, for
instance a work bench. The height of the working place should be laid out according to ergonomic
recommendations. The required space depends on the dimensions of the work pieces to be finished.
3.2.2 SURFACE
A solid, level, horizontal and non-slip surface is required!
3.2.3 POWER SUPPLY
5-pole CEE plug, 16 A, with interpoles for reversing rotation.
Other voltages according to regulations.
Содержание UNIPRESS 4
Страница 1: ...OPERATION MANUAL UNIPRESS 4 UP4 GATES TUBE FITTINGS GMBH...
Страница 37: ...37 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 7 SPARE PARTS 7 1 HOUSING...
Страница 40: ...40 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 7 4 HYDRAULIC DRIVE...
Страница 44: ...44 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 7 6 ACCESSORY KIT 15 25 30 5 20 40 35 10 25 45 421560...
Страница 49: ...49 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 8 APPENDIX 8 1 ELECTRIC CIRCUIT DIAGRAM...
Страница 50: ...50 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL ELECTRIC CIRCUIT DIAGRAM...
Страница 51: ...51 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL ELECTRIC CIRCUIT DIAGRAM...
Страница 52: ...52 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 8 2 HYDRAULIC CIRCUIT DIAGRAM...
Страница 53: ......
Страница 54: ...GATES 2024 GATES COM E2 50240 02 2024...