12
GATES.COM
UNIPRESS 4 (UP4)
OPERATION MANUAL
1.2.5 RISKS OF MACHINE OPERATION
The machine has been built according to state-of-the-art technology and the acknowledged safety-specific
rules. Nevertheless it may pose a threat to the health and life of users or third parties; operating the machine
may affect adversely the machine itself or other valuables.
Because of the working stroke of the tool, an element of risk remains. In normal operation, the pipe is held in
the left hand of the operator, the right hand actuates the pushbutton for the working stroke. The operator
cannot reach into the working stroke range with his hand.
The Tuboform was designed as a one-man working place; a second operator means additional risks.
The machine shall only be applied
for its intended use
in a safety-related sound condition.
Before starting the machine, make sure that all protective facilities and safety
requirements, for instance removable protective facilities and emergency-off facilities,
are available and in working order!
Any safety-related failures shall be corrected immediately!
1.2.6 USE AS INTENDED
The basic unit of the TUBOFORM C is a universal basic adaptor for different attachments. With the cutting
ring attachment, a variety of different cutting rings from 6 to 42 mm or 1/4 “ to 2 “ in diameter can be fitted
up to the maximum operation pressure.
The flaring head has been laid out for 37° flared edges from 6 to 42 mm or 1/4 “ to 1 1/2 “Ø. Precision steel
pipes according to DIN 2391/C Material St.37.4 NBK and stainless steel tubes 1.4571 /1.4541 within the
diameter range from 6 to 42 mm can be machined.
With the presetting attachment for 10° flares, VOSS BV-10 as well as Zako flange connections from 16 to 38
mm Ø can be fitted.
Any operation going beyond the use mentioned above is not according to regulations.
PIPE BENDING
SYSTEMS
cannot be held responsible for damage resulting from misuse.
Operation according to regulations also means
acknowledging all rules and regulations of the Operation Manual and
keeping the schedule for inspection and maintenance according to directions or within the period stipulated
by the OM.
Содержание UNIPRESS 4
Страница 1: ...OPERATION MANUAL UNIPRESS 4 UP4 GATES TUBE FITTINGS GMBH...
Страница 37: ...37 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 7 SPARE PARTS 7 1 HOUSING...
Страница 40: ...40 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 7 4 HYDRAULIC DRIVE...
Страница 44: ...44 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 7 6 ACCESSORY KIT 15 25 30 5 20 40 35 10 25 45 421560...
Страница 49: ...49 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 8 APPENDIX 8 1 ELECTRIC CIRCUIT DIAGRAM...
Страница 50: ...50 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL ELECTRIC CIRCUIT DIAGRAM...
Страница 51: ...51 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL ELECTRIC CIRCUIT DIAGRAM...
Страница 52: ...52 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 8 2 HYDRAULIC CIRCUIT DIAGRAM...
Страница 53: ......
Страница 54: ...GATES 2024 GATES COM E2 50240 02 2024...