ASSEMBLY
Page
10
05/14
Introduction
The fertiliser spreader has been
assembled as far as practicable at the factory to
minimize the amount of work required in the
field. The unit has been inspected and tested
before it leaves the factory and requires only a
few basic checks before it is commissioned.
Lifting the Spreader
The Spreader has been supplied with 4
lifting points located at each corner at the top of
the bin. Use appropriate lifting chains or
shackles and slings. Ensure that the spreader is
empty before attempting to lift the spreader.
Spreader weight unloaded
5030 model
1250kg approx.
Fig. G3 5030 model spreader.
Final Pre-Delivery Check List
After the Spreader has been assembled
and the distribution system fitted to the
implement a final check should be carried out
before delivery.
Trailer General
1. All wheel nuts tight.
2. Safety hitch chain has been fitted.
3. Check tyre pressures.
4. Bins clean on inside, no loose items.
5. Spinner tacho is working.
Hydraulic Connections
The hydraulic system has been tested
prior to dispatch from the factory.
Standard 1/2'” breakaway connectors
have been fitted to the spreader hoses. When
connecting to the tractor, place the smaller
diameter hose in the supply (pressure) remote
outlet on the tractor. The larger hose should
then be connected to the return flow remote.
Содержание 5030 Series
Страница 2: ...05 14 Page Intentionally Blank ...
Страница 4: ...05 14 Page Intentionally Blank ...
Страница 13: ...ORDERING PARTS Page 9 05 14 PART No DESCRIPTION QTY COST DATE ...
Страница 28: ......
Страница 29: ...5030 PARTS ...
Страница 30: ...General Spare Parts Page24 07 18 ...
Страница 34: ...08 14 Page Intentionally Blank ...
Страница 38: ...Rear of Bin Spare Parts Page 32 06 14 ...
Страница 48: ...Page Intentionally Blank ...
Страница 80: ...Page 41Settings Operator Notes Page 75 ...