Installation and Operation Manual
Argos WA - Pressure Regulating Valve
MI-44
Elaborado
Verificado / Aprovado
CSQ
Data
Revisão
Página
JJ
GN
JM
03/09/18
01
14 de 20
5 – COMMISSIONING AND START UP
5.1 – PRESSURE REGULATOR ADJUSTMENT
Always, before proceeding with the equipment commissioning it is important to:
1) Check if the equipment is properly installed according to the recommendations of item 4.5 of this manual.
2) Shut the blocking valves of the inlet, output and bypass (if applicable)
3) Open vent valve downstream of the last pressure regulator installed on the span.
4) Make sure that the station is depressurized.
5) Check if all connectors are properly secured in the station before starting pressurization of the span.
6) Check if the installed equipment has suitable operating conditions, using the information available on the
nameplate attached to the equipment.
7) Make sure that the SSV is in the shut position.
ATTENTION:
* Under no circumstances proceed with pressurization of the span where the
equipment is installed by the downstream valve of the equipment.
* Under no circumstances proceed with the depressurization of the span
where the equipment is installed by the valve located upstream of the
equipment, such as the filter drain.
ATTENTION:
GASCAT’s SSV are sent to the field already calibrated, however,
depending on transport conditions and the equipment handling the
valve may have its set point changed.
Therefore, we recommend that you check the SSV set point with the
help of an external air supply directly connected to the actuator,
before proceeding with the pressurization of the span.
The model BRISE PLUS valves are not sent to the field with adjusted
set points; this measure tends to preserve the life of the equipment
internals. Therefore, after receiving a pressure regulator valve model
BRISE PLUS, remember that you must perform the set point
adjustment before putting the equipment into operation.
The pressure reducing station setting shall be in accordance with the DIN EN 12186 / NBR 12712
standards and all other regulations in force in the region where it will operate.