manualshive.com logo in svg
background image

GASBOY Series 9820Q

18

MDE-4339 9820Q ASTRA Installation/Operation • July 2004

Ground

To ensure proper operation of the equipment and provide the necessary safety factors, this unit
must be grounded.  A ground wire (preferably green) must be connected between the ground screw
of the register and the main electrical service panel.  One (1) earth ground connection is required
per unit.  The ground rod is to be a solid, corrosion-resistant conductor and must be installed at the
main electrical panel in accordance with the National Electrical Code.  It should be properly tied
into the ground bus strip of the panel.  We recommend the neutral and ground bus strips be bonded
together (unless prohibited by local codes).

Circuit Breakers

Power to the unit must be supplied from dedicated breakers.  No other equipment should be
powered from these breakers.  AC power for the micro power must come from a different breaker
than that of the pump.  This not only provides electrical isolation for the micro power, but allows
the unit to be disabled without shutting off power to the microprocessor PCB.  The AC power for
the micro power may be grouped together for multiple units.  It is recommended that no more than
8 units be supplied from one breaker.

Pump Motor

Pumps are shipped from the factory with motors wired according to the specifications given on the
order as to kind of current, frequency and voltage.

Very often on installation, it becomes necessary to change the original setting to suit the AC power
source.  To do this, locate the motor change-over plate and remove the screw which secures it in
place.  Slide the plate so that the desired voltage, as marked on the plate, lines up with the screw
hole.  Reinsert the screw and secure the plate in place.

Many motor failures result from improper setting of the motor change-over plate.  If set for 115
VAC and a 230 VAC feed is used, the motor will burn out after running only a short time.  If set
for 230 VAC and a 115 VAC feed is used, the motor will run very slowly and the starting field will
soon burn out.

Pulse Output

The Pulse Output option provides the means for an external system to monitor the quantity that is
dispensed by the 9820Q dispensing unit.  A description of the interface is provided in 

Control

Lines, Pulse Output

, in Section 3.  Consult the wiring diagrams provided in 

Wiring

 in Section 4,

along with the installation manual of the system that will be connected to the 9820Q dispensing
unit.

RS-485

The RS-485 option provides the means for direct connection to a GASBOY CFN Series System or
TopKAT System.  Consult the wiring diagrams provided in 

Wiring

 in Section 4, along with the

installation manual of the CFN Series System or TopKAT System for proper wiring.

Содержание ASTRA 9820Q Series

Страница 1: ...Series 9820Q ASTRA Installation Operation Manual MDE 4339 formerly 035090...

Страница 2: ...A 9152A 9153A 9800A 9840A 9850A 9852A 9853A 9140 G 70 52 AM G 70 150 AE Balance Vapor Recovery VaporVac MH6418 Power operated Transfer Pump Models 25 26 27 28 72 72S 72SP 72X 73 and 182 4997 9822A 982...

Страница 3: ...aft DO NOT use commercial pumps for direct fueling of aircraft without filters and separators necessary to ensure product purity DO NOT use where sanitary design is required for food products for huma...

Страница 4: ...rt 15 of the FCC rules These limits are designed to provide reasonable protection against harmful interference when the device is operated in a commercial environment This equipment generates uses and...

Страница 5: ...22Q 9823Q 7 011930 Base Layout Models 9822Q 9823Q 8 011884 Base Layout Models 9822Q 9823Q 9 011885 Base Layout Models 9822Q 9823Q 10 011885 Base Layout Models 9822Q 9823Q 11 3 Control Lines 13 Purpose...

Страница 6: ...izer 33 Electronic Totalizer 33 Mechanical Totalizer 34 Operating Sequence 34 Nozzle Locking 35 6 Start Up and Test 36 Installation Completion Checklist 36 Start Up 37 Post Start Up Tests 37 Voltage 3...

Страница 7: ...ivery rate varies depending upon installation conditions and added accessories Both models of the 9820Q offer electronic registration of the quantity dispensed NOTE NFPA regulations do not allow tank...

Страница 8: ...connect to Gasboy CFN equipment Battery backup for display of last transaction and capture of remnant pulse count in the event of a power failure Mechanical totalizer Dual stage solenoid valve A work...

Страница 9: ...w In order to provide the highest level of safety to you your employees and customers we recommend that all employees be trained as to the location and procedure for turning off power to the entire sy...

Страница 10: ...es are required to the nozzle hook or boot assembly when using vapor recovery nozzles Please note that the vapor recovery nozzles approved for use are the short spout type The following nozzles and ho...

Страница 11: ...ngth of hose less nozzles and fittings Register Minimum Radius Indicates the closest the register assembly can be to the specified starting point any closer than this distance may allow hose to touch...

Страница 12: ...GASBOY Series 9820Q 6 MDE 4339 9820Q ASTRA Installation Operation July 2004 Typical Installation See page 19 for cable requirements...

Страница 13: ...Installation MDE 4339 9820Q ASTRA Installation Operation July 2004 7 011931 Base Layout Models 9822Q 9823Q View 1 Pumping Unit Assembly...

Страница 14: ...GASBOY Series 9820Q 8 MDE 4339 9820Q ASTRA Installation Operation July 2004 011930 Base Layout Models 9822Q 9823Q View 2 Register Assembly...

Страница 15: ...Installation MDE 4339 9820Q ASTRA Installation Operation July 2004 9 011884 Base Layout Models 9822Q 9823Q Optional Post...

Страница 16: ...GASBOY Series 9820Q 10 MDE 4339 9820Q ASTRA Installation Operation July 2004 011885 Base Layout Models 9822Q 9823Q Side and Rear Brackets View 1...

Страница 17: ...Installation MDE 4339 9820Q ASTRA Installation Operation July 2004 11 011885 Base Layout Models 9822Q 9823Q Side and Rear Brackets View 2...

Страница 18: ...GASBOY Series 9820Q 12 MDE 4339 9820Q ASTRA Installation Operation July 2004...

Страница 19: ...tied into the ground bus strip of the panel We recommend the neutral and ground bus strips be bonded together unless prohibited by local codes Micro Feed The Micro Feed is a 115 VAC 230 VAC Int l inp...

Страница 20: ...any conduit or chassis metal mis wired or be connected to any equipment requiring more than stated maximum allowable current If these restrictions are not followed damage to the CPU PCB will occur Ph...

Страница 21: ...peration July 2004 15 RS 485 When the dispensing unit includes the optional RS 485 interface RS 485 lines are provided This interface allows the user to connect a GASBOY CFN Series System or TopKAT sy...

Страница 22: ...GASBOY Series 9820Q 16 MDE 4339 9820Q ASTRA Installation Operation July 2004...

Страница 23: ...he motor should be on a separate circuit and installed on a 20 to 30 AMP breaker depending on the motor size and or the voltage setting 6 Install an emergency power cutoff In addition to circuit break...

Страница 24: ...pped from the factory with motors wired according to the specifications given on the order as to kind of current frequency and voltage Very often on installation it becomes necessary to change the ori...

Страница 25: ...lows the pulser wires to run in the same conduit as the AC wiring for the short distance between the pumping unit and the register assembly Belden 89418 is rated as follows Gas and Oil resistant insul...

Страница 26: ...fit Manual C35628 for details The GASBOY Warranty will not apply to any dispenser in which the AC and DC wires are run in the same conduit J Box or wireway except as noted The GASBOY Warranty will not...

Страница 27: ...Wiring MDE 4339 9820Q ASTRA Installation Operation July 2004 21 Terminal Block ID The terminal blocks shown below are located in the register assembly...

Страница 28: ...parate relay to prevent false triggering of the authorization signal 3 If the PUMP MOTOR line is controlled by a fuel management system using solid state relays a resistor assembly must be installed b...

Страница 29: ...Installation Operation July 2004 23 023866 Wiring Diagram Models 9822Q 9823Q Domestic 115 230 VAC WARNING Failure to follow the correct wiring diagram and all the listed notes and precautions may resu...

Страница 30: ...r assembly must be installed between the Pump Motor Feed line and Neutral to prevent false triggering of the authorization input The resistor assembly is 30K OHM 10 Watt P N C06683 for 230 VAC interna...

Страница 31: ...stallation Operation July 2004 25 023867 Wiring Diagram Models 9822Q 2 9823Q 2 International 230VAC WARNING Failure to follow the correct wiring diagram and all the listed notes and precautions may re...

Страница 32: ...GASBOY Series 9820Q 26 MDE 4339 9820Q ASTRA Installation Operation July 2004...

Страница 33: ...iew This section describes the operation of the pump It shows how to access the electronic components how to set the internal switches the optional battery back up power supply how to view and reset t...

Страница 34: ...iar with the location of some key components as well as the various switch selectable operating modes 1 Unlock and remove the front panel Remove the two screws located at the top of the door assembly...

Страница 35: ...to reflect the communication rate of the GASBOY RS 485 pump loop open for 9600 baud or closed for 1200 baud The GASBOY CFN system and TopKAT communicate at 9600 baud SW1 2 Mode If the 9820 is control...

Страница 36: ...Series 1000 TopKAT mechanical and all non GASBOY systems When open the 9800 ignores the Control Feed line required setting for CFN TopKAT electronic or no fuel system SW1 7 Totalizers This switch sho...

Страница 37: ...ured by setting the switches as shown in the chart at right The pulse rate represents pulses per gallon PPG domestic or pulses per liter PPL international For domestic units the pulse rate can be up t...

Страница 38: ...tes whether or not temperature compression is enabled and if so what product is being dispensed 0 temperature compensation enabled 1 product is gasoline and compensation is enabled 2 product is diesel...

Страница 39: ...on the power supply View Reset Totalizer Electronic Totalizer The 9820Q stores a running quantity total This electronic totalizer works independent of the optional mechanical totalizer that may be in...

Страница 40: ...of the pumping unit Operating Sequence The exact sequence of events that occurs during the operation of the pump is determined by various switch settings inputs and the user A typical transaction is e...

Страница 41: ...ructions below 1 Insert the nozzle onto the hook assembly with the nozzle tip inside of the boot 2 Slide the rear bracket of the nozzle hook assembly upward until the holes near the bottom of the nozz...

Страница 42: ...ecured 3 All plumbing must be complete and tight All liquid carrying lines must be checked for leaks 4 When DC pulse output lines are used in the pump for connecting to GASBOY fuel management systems...

Страница 43: ...rrected before testing is continued It is good practice to take voltage readings while the pump is operating on bypass and also while making a delivery Any voltage drop in excess of 10 during either o...

Страница 44: ...nt in the prover to match the display turn counter clockwise to increase the amount in the prover to match the displayed Moving the wheel one hole position changes the calibration by 2 3 cubic inch pe...

Страница 45: ...thorized Parts Should excessive wear rust or corrosion of parts cause inefficient operation it is always best to replace them immediately but if you want the best results and continuity of the Underwr...

Страница 46: ...removing the cartridges to prevent contamination of both the soil and the electrical components within the cabinet Adjust the Belts With the proper care belts will give exceptionally good service A l...

Страница 47: ...date of original invoice The warranty covers parts only Keytrol The Keytrol is warranted against defects in material and workmanship for one year from date of installation or 24 months from date of or...

Отзывы: