work has been completed
•
The power line should be fitted upstream with a suitable device to
protect against short-circuits and earth leakage and isolate the
appliance from other equipment
•
Use cables with double insulation, in accordance with the
standards in force in the country concerned
•
The appliance must be earthed.
INFORMATION!
The manufacturer is not liable for any damage caused by failure to
earth the appliance.
6 Commissioning
6.1 Starting the operation the first time
INFORMATION!
Before operating the N
2
-Generator for the first time, proceed as
follows:
•
Remove the cap on the N
2
outlet on the rear of the generator
(6)
•
Connect the power cable to the power socket
(10)
•
Turn the appliance on at the power switch
(9)
•
Start production pressing the Start / Stop button. After a delay
time of 90 sec the device starts.
•
If necessary, set the outlet pressure at the outlet pressure
regulator
(5)
•
Run the device for about 10 min before connecting the nitrogen
outlet
(6)
to
a device
.
•
Up to 48 h purging time is necessary for the initial installation.
•
It is recommended to run the system for about 16h before starting
a measurement.