
EN
28
Installation Instructions
Commissioning:
• Connect Data Link to GLB Modbus terminal “Data Link” (refer to Mainboard simplified connection
diagram) Note, Modbus connection between GLB Wallboxes must be connected as following: A-
to A- and B+ to B+ see (figure 27) (figure 28).
• Config SW1 (DIP 5-6) see (figure 27) (figure 28).
If you want to use LAN-cable to access the GLB-Wallbox web-interface, you can install a LAN cable to
the RJ45 port on the communication card.
The GLB-Wallbox RJ45 port settings is DHCP as default.
RFID settings, see section web interface in this manual
LAN connection via RJ45 port on communication card (only for
GLB-Wallbox with communication card installed)
Содержание Wallbox GLB Series
Страница 1: ...EN GARO Wallbox GLB Assembly instructions End User Instruction EN manual 380185 4 0...
Страница 30: ...EN 30 Installation Instructions 205 124 422 Dimensional drawing figure 31...
Страница 36: ...EN 36 End User Instruction Main menu Doubleclick on the GARO symbol and extended information shows...
Страница 48: ...48 EN GARO AB Box 203 SE 335 25 Gnosj Phone 46 0 370 33 28 00 info garo se garo se...