![GARO LS4 Wallmounted Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/garo/ls4-wallmounted/ls4-wallmounted_operational-instructions_3598266012.webp)
11
Setting up the secondary meter and Phase
rotation on the DLM Master
Meter configuration
(Second)
Phase rotation of the
ChargePoint
Model of the external meter.
This meter should be addressed “2” and be connected to
the DLM masters meter bus.
RST (L1/L2/L3, Standard Reference Phasing
The phase rotation from the grid on the posts incoming
terminals.
Содержание LS4 Wallmounted
Страница 1: ...LS4 GLB Operational Instructions...
Страница 3: ...Interior Bottom Interior Lower Middle 2...
Страница 4: ...3 Interior Upper Middle Interior Top...
Страница 5: ...4 Connecting the Laptop computer...
Страница 9: ...8 Setup of DLM with external Secondary Meter...
Страница 14: ...13...
Страница 15: ...14...