background image

PD-5 Operator Manual 

Model PD-5 

(Physical Hard Drive Destroyer) 

 

Operator Manual 

 

 

 

 
 
 

 

10620 Industrial Ave. Suite 100 

Roseville CA 95678 

USA 

(916) 784-0200 
(800) 624-1903 

 

4075-411L Operation Manual 

 

Содержание PD-5

Страница 1: ...PD 5 Operator Manual Model PD 5 Physical Hard Drive Destroyer Operator Manual 10620 Industrial Ave Suite 100 Roseville CA 95678 USA 916 784 0200 800 624 1903 4075 411L Operation Manual...

Страница 2: ...fication 3 Front Panel Description 3 Inside Component Identification 3 Inside Component Description 3 Operation 4 Single Button Operation 4 Display Messages 4 Hard Drive Destruction 5 Multiple Hard Dr...

Страница 3: ...ts Inc at 800 624 1903 for further information if required Inspection 1 Unpack the shipping carton case and take out the PD 5 Physical Destroyer 2 Inspect the PD 5 for shipping damage as soon as it is...

Страница 4: ...the destruction process If opened during the destruction process the destruction wedge will automatically stop When the door is closed the destruction wedge will return to its home position Inside Com...

Страница 5: ...e door and remove the hard drive s when the LCD displays Ready Session 1 indicating the destruction process is complete and a cycle has been recorded 6 Repeat Steps 2 5 until the job is complete Displ...

Страница 6: ...ptop drives standard 1 drives and 1 5 drives To destroy hard drives 1 Press Power button 2 Remove mounting hardware from hard drive that would cause the media door not to close 3 Lift door and insert...

Страница 7: ...ives at one time The actual capacity of multiple hard drive destruction depends on the height and physical construction of each hard drive model If the PD 5 fails to crush multiple drives at one time...

Страница 8: ...he SSD Destroyer Note It is important to center the media from front to back and side to side inside the SSD 3 Close the door and press the Destroy button The PD 5 and the SSD Destroyer will destroy t...

Страница 9: ...heck bottom of crush chamber for additional debris If additional debris is found use a small brush to move additional debris to the front of the destruction chamber There are two holes that allow debr...

Страница 10: ...rives Operating Environment 41 F 104 F 5 C 40 C Humidity 10 to 80 Non Condensing Physical Weight PD 5 Net 72 lbs 32 66Kg Case 23 lbs 10 43 Kg Shipping Weight 82 lbs 37 19 Kg Physical Dimensions PD 5 1...

Страница 11: ...or addition to this warranty DISCLAIMER THIS WARRANTY SET FORTH ABOVE IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNE...

Страница 12: ...personnel Do not operate if the door is damaged or missing For continued protection against risk of fire replace only with the same type and rating of fuse A non shielded power cord may be used to co...

Страница 13: ...PD 5 Operator Manual Page 12 DECLARATION OF CONFORMITY...

Отзывы: