Installation Procedure
Page 2-6
GDL 69/69A Installation Manual
Revision E
190-00355-02
Table 2-3. Recommended Crimp Tools
20-24 AWG
Wire Gauge
Hand
Crimping Tool
Positioner
Insertion/
Extraction Tool
Military
P/N M22520/2-01
M22520/2-09 M81969/1-04
Positronic 9507 9502-3
M81969/1-04
ITT Cannon
995-0001-584
995-0001-739
n/a
AMP 601966-1
601966-6
91067-1
Daniels AFM8
K42
M81969/1-04
Astro 615717
615725
M81969/1-04
NOTE
1.
Insertion/extraction tools from ITT Cannon are all plastic; others are plastic with metal tip.
2.
Non-Garmin part numbers shown are not maintained by Garmin and are subject to change
without notice.
2.5.2 Connector
Assembly
1.
Backshell Cast Housing: Provides a mounting point for all other connector accessories.
2.
Configuration Module: Installation details provided in Section 2.5.3.
3.
D-Sub-Miniature Connector: Installation details provided in Section 2.5.3.
4.
Spider Ground System: Allows shield grounds to be made to the backshell housing. Installation
details provided in Section 2.5.5.
5.
Strain Relief Tab: Provides strength and support to wiring bundles.
6.
Backshell Lid: Provides easy access when servicing connector.
Содержание GDL 69
Страница 1: ...190 00355 02 June 2006 Revision E GDL 69 69A Installation Manual ...
Страница 2: ...This Page Intentionally Left Blank ...
Страница 52: ...Limitations Page 6 2 GDL 69 69A Installation Manual Revision E 190 00355 02 This Page Intentionally Left Blank ...
Страница 56: ...STC Data Page A 2 GDL 69 69A Installation Manual Revision E 190 00355 02 This Page Intentionally Left Blank ...
Страница 69: ......
Страница 70: ......