CUTOUT
9.125" x 7"
(231.8mm x 177.8mm)
4 HOLES
FRONT VIEW
TOP VIEW
11"
10 3/16"
8 3/16"
9"
(228.6mm)
(208mm)
(279.4mm)
(258.8mm)
5/32
(4mm)
4.1 A
SSEMBLY
/ I
NSTALLATION
Check and ensure, that the supply voltage matches the voltage given on the specification plate.
The cooker must be installed so that it is level and that the top of the unit has been sealed to the counter. Install
the air intake kit to the bottom of the unit, and ensure that there is a minimum of 30 sq inch opening to allow the
heated air from the cooling fan to be discharged into the room.
Install the remote mounted controls at the front of the unit in a convenient location, and connect to the unit (2 con-
trols are provided for the dual hob model).
2 1/4“
(57mm)
2 1/4“
(57mm)
control knob
control knob
edge-
protection
2
3/8
”
(60mm)
2
3/8
”
(60mm)
1
3/8
(35mm) Cable
1
3/8
(35mm) Cable
6 3/8”
(162mm)
6 3/8”
(162mm)
6 1/2”
(165mm)
6 1/2”
(165mm)
Cut-Out for
Control Box
Cut-Out for
Control Box
5”
(127mm)
5”
(127mm)
7 7/8”
(200mm)
7 7/8”
(200mm)
Turn the control knob to the OFF-position before connecting the cooker to the voltage supply.
The operator has to insure that all installation, maintenance and inspection work is carried out by authorized and
qualified personnel.
Page 9
Figure 1
Содержание GIU 5.0 DUAL BI
Страница 17: ...NOTES Page 17...
Страница 18: ...NOTES Page 18...
Страница 19: ...NOTES Page 19...
Страница 20: ......