English
English
25/68
5.1. LIST OF MATERIALS
This machine includes the following elements
that you will fi nd inside the box:
• High Pressure Pump
• Transformer with switch On / Off
• 10 m Black Nylon Pipe
• Nylon pipe to Pump Connector
• 6 Nozzles
• 5 Straight and End Connectors
• Transparent suction pipe.
• Water fi lter with pump connector.
• Pipe Cutter
• Pipe Sharpener
• Instruction manual
5.2. MOUNTING THE MACHINE
5.2.1. Installation of the Nozzle line
Study the location where you will place the nozzles by
choosing the most suitable path for the nylon pipe.
Take into account where you are going to locate the
machine, that the machine needs a point of electric
current and that the machine, cable and electrical
connection, must be in a dry area and out of reach of
the nozzles.
The length of Nylon pipe supplied with the machine
is 10 m. If you need more pipe keep in mind that
the recommended maximum distance between the
machine and the last diffuser is 25 meters.
1. Cut the pipe where you want to place a nozzle
using the supplied cutter.
2. Use the sharpener to create the conical support
necessary for the correct coupling of the connector
3. Push the section of cut pipe into the connector
At the end of the pipe there should always be a nozzle
with the end connector.
4. Screw the nozzles into the connectors
5. START UP INSTRUCTIONS
Содержание FOGGY HOME
Страница 17: ...Espa ol 17 68 NOTAS...
Страница 33: ...English 33 68 NOTAS...
Страница 49: ...Portugu s 49 68 NOTAS...
Страница 65: ...Italiano 65 68 NOTAS...
Страница 66: ...Italiano 66 68 NOTAS...
Страница 68: ......