34
ENGLISH
ATTENTION ! Each purlin is designed to be perfectly aligned with the gables.
Check the inclination of each purlin to ensure correct positioning.
Consolidate the construction with the 4 storm battens (parts S) fastened to the inside of the
front and rear walls with M8x60 bolts. These parts are screwed after having tightened the
side wall planks, as well as the planks and the front and rear gables.
NOTE :
ث
The hurricane battens should only be screwed against the bottom plank and the first gable
beam at the top;
ث
M8x60 bolts should not be over-tightened to allow the planks to work.
⑥
DOOR INSTALLATION
ITEM
DESCRIPTION
DIMENSIONS (MM)
QTY
I
Right and left door (semi-glazed)
700 x 1585 mm
2
Place the 2 doors (part I) on the hinges.
I
I
I
I
I1
I1
I2
I3
Содержание 22196
Страница 9: ...9 FRAN AIS POSE DE LA BASE PLAN DE MONTAGE PAR TAPES DESSINS A A B H1 H1 OUTILS NECESSAIRES...
Страница 28: ...28 ENGLISH BASE INSTALLATION STEP BY STEP ASSEMBLY PLAN SKETCHES A A B H1 H1 NECESSARY TOOLS...
Страница 37: ...37 ENGLISH EXCEPTIONAL DOOR SETTING Remove the door frame unscrew Drill 10 mm OUTSIDE VIEW INSIDE VIEW...
Страница 47: ...47 DEUTSCH AUFBAU DES GRUNDRAHMENS SCHRITTWEISE MONTAGE IN SKIZZEN A A B H1 H1 BEN TIGTES WERKZEUG...
Страница 66: ...66 ESPA OL INSTALACI N B SICA PLANO DE MONTAJE PASO A PASO DIBUJOS A A B H1 H1 HERRAMIENTAS NECESARIAS...
Страница 85: ...85 ITALIANO INSTALLAZIONE DELLA BASE FASI DI MONTAGGIO DISEGNI A A B H1 H1 STRUMENTI NECESSARI...
Страница 104: ...104 POLSKI U O ENIE PODSTAWY PLAN MONTA U KROK PO KROKU RYSUNKI A A B H1 H1 WYMAGANE NARZ DZIA...
Страница 113: ...113 POLSKI NIETYPOWE OSADZENIE DRZWI Zdemontowa ram drzwiow odkr ci Wiert o 10 mm WIDOK ZEWN TRZNY WIDOK WEWN TRZNY...
Страница 123: ...123 PORTUGU S COLOCA O DA BASE ESQUEMA DE MONTAGEM PASSO A PASSO DESENHOS A A B H1 H1 FERRAMENTAS NECESS RIAS...
Страница 137: ......