
36
37
GB
NOTE ! Each purlin has been designed to fit perfectly to the walls.
Check the inclination of each purlin to ensure it’s in correct position.
Reinforce the construction with 4 ridge battens (part S) fixed from the inside to the front and
back wall using M8x60 screws. These parts should be screwed after tightening the side,
front and back walls of the garden house.
NOTE :
4
the ridge battens should be screwed only to the lower board at the very bottom and to
the first board at the top;
4
M8x60 screws shouldn’t be over tightened to give the boards ability to work.
⑥
6. DOOR ASSEMBLY
CODES
PART DESIGNATION
DIMENSIONS (MM)
QTY
I
Right door and left door (partially glazed)
720 x 1630 mm
2
Place the two doors (part I) on the hinges.
I
I
I
I
I1
I1
I2
I3
Содержание 22191
Страница 8: ...8 FRANÇAIS INFORMATIONS SUR LA DEMANDE DE TRAVAUX ...
Страница 12: ...12 FRANÇAIS POSE DE LA BASE OUTILS NÉCESSAIRES A A H1 H1 B ...
Страница 27: ...27 GB INFORMATION ON THE ASSEMBLY AUTHORISATION ...
Страница 31: ...31 GB MOUNTING THE BASE REQUIRED TOOLS A A H1 H1 B ...
Страница 40: ...40 ENGLISH EXCEPTIONAL DOOR SETTING Remove the door frame unscrew Drill Ø 10 mm OUTSIDE VIEW INSIDE VIEW ...
Страница 46: ...46 DEUTSCH INFORMATIONEN FÜR DEN BAUANTRAG ...
Страница 50: ...50 DEUTSCH AUFBAU DER BASIS BENÖTIGTES WERKZEUG A A H1 H1 B ...
Страница 65: ...65 ES INFORMACIÓN SOBRE LA SOLICITUD DE TRABAJO ...
Страница 69: ...69 ES LA COLOCACIÓN DE LA BASE HERRAMIENTAS NECESARIAS A A H1 H1 B ...
Страница 84: ...84 ITALIANO INFORMAZIONI UTILI SUL PROCESSO DI MONTAGGIO ...
Страница 88: ...88 ITALIANO INSTALLAZIONE DELLA BASE STRUMENTI NECESSARI A A H1 H1 B ...
Страница 103: ...103 PL INFORMACJE DOTYCZĄCE ZGŁOSZENIA PRAC MONTAŻOWYCH ...
Страница 107: ...107 PL UŁOŻENIE PODSTAWY WYMAGANE NARZĘDZIA A A H1 H1 B ...
Страница 118: ......