The compressor must be checked regularly for
damage and excess wear.
Spilt oil must be immediately wiped up. Oil traces
must be removed immediately.
Electrical connections
The condition of cables and terminals must be
checked regularly.
Check for loose connections or frayed or worn-
through wires.
All connections must be clean and tight.
Immediately replace worn-through or damaged
wires.
Leak points
WARNING
Risk of injury due to high pressure
➯
Do not manually investigate leak
points in the system.
➯
Always use paper or board for this
purpose.
If leaks are suspected, check the correspond-
ing area for leaks.
Immediately repair or replace damaged or leak-
ing pipe or hose connections.
Emission or leakage of operating fluids
The following operating fluids are used in the com-
pressor:
FLUIDFORCE SCREW WARRANTY LUBRI-
CANT compressor oil (harmless if handled nor-
mally)
POLYREX EM lubricating grease (harmless if
handled normally)
In the event of accidents or prolonged contact with
operating fluids, observe the information in the
hazardous substance data sheets!
Prevent leakage of operating fluids.
Carefully clear up any operating fluids that escape.
Observe the information in the hazardous sub-
stance data sheets!
Oil carbon deposits in the oil lubrication sys-
tem
High oil temperatures reduce the service life of the
oil and this can lead to oil carbon deposits in the
oil lubrication system. Oil carbon deposits can re-
sult in damage to the bearings and gearboxes.
8.5
Maintenance plan
with
2000 hour service package
Maintenance work should be carried out regularly as recommended in the following maintenance plan.
In the majority of cases the maintenance plan is appropriate, however under certain circumstances it is
possible that changes to the details may be necessary. The maintenance plan should always be used as
a guideline. However, if based on experience a change is necessary, then this should be discussed with
Gardner Denver.
Maintenance plan: Maintenance every 8 operating hours
Component
Measure
Necessary qualification Carried out
Oil tank level check
Check and refill if neces-
sary
Maintenance personnel
On-load/off-load machine
function
Check and report if nec-
essary
Operator
Pressure and tempera-
ture at discharge
Check
Operator
Control Panel
Check for fault mes-
sages and notify when
necessary
Operator
Chart 8-1: Maintenance plan, very 8 operating hours