13-20-604 Page 50
Once proper alignment has been obtained, lock the sheave in place on the motor shaft; then the jack bolt
lock nuts must be tightened. One set of nuts is tightened down against the base to lock the jack bolts in
place. The second set is locked down to sandwich the hinged plate against the jack bolt heads. When
lock nuts are in place, a final alignment check should be made with the straight edge.
Note
: Any of the following actions will require the sheave alignment be checked and any or all of the
above steps repeated. (Initial start up at customer site, compressor change, motor change, unit
relocation, or when the belts are replaced.)
It’s important to note that the belts should not be over tightened. To check belt tension use a Gardner
Denver Belt Tension Gauge, Part Number 00543217. V-belt tension will drop after the first 8-24 hrs of
unit run time. Failure to check and re-tension the belts after the initial run-in period will result in belt
slippage and premature belt failure. Please see Figure 7-1, page 51 for proper belt tension.
Interference between the fan and the orifice can damage equipment. Be certain
the orifice has even clearance around the fan before starting the unit.
REPLACING THE COMPRESSOR SHEAVE
1.
Disconnect, lockout and tagout the power supply to the starter.
2. Remove
the
guards.
3.
Using the adjusting screws, jack the motor base up to loosen the belt tension, Remove the belts.
4.
Remove bolts from tapered bushing.
5.
Pull the sheave off the rotor shaft with a gear puller, if necessary.
6.
Install new sheave and tapered bushing.
7.
Install new belts. Check for correct belt tension and reattach the wire guard.
8.
Align sheaves with a straight edge. (See “SHEAVE ALIGNMENT”, page 49).
9.
Assemble the guards.
CHECKING BELT TENSION
- Using a spring scale, apply a perpendicular force to each belt at the
midpoint of the span and measure the deflection. Correct deflection force and deflection are shown in
Figure 7-1. To tighten belts, merely increase the center distance.
NOTICE
When a new set of belts is installed on a drive, the initial deflection force should
be 1/3 greater than shown in Figure 7-1. Recheck tension frequently during the
first 24 hours of operation
Содержание INTEGRA EFD99E
Страница 11: ...13 20 604 Page 10 Figure 1 2 COMPRESSOR ILLUSTRATION 300EFD797 B Ref Drawing ...
Страница 30: ...13 20 604 Page 29 Figure 4 3 WIRING DIAGRAM FULL VOLTAGE 308EDE46 A Ref Drawing Page 1 of 2 ...
Страница 31: ...13 20 604 Page 30 308EDE46 A Ref Drawing Page 2 of 2 ...
Страница 32: ...13 20 604 Page 31 Figure 4 4 WIRING DIAGRAM WYE DELTA 309EDE546 A Ref Drawing Page 1 of 2 ...
Страница 33: ...13 20 604 Page 32 309EDE546 A Ref Drawing Page 2 of 2 ...
Страница 34: ...13 20 604 Page 33 Figure 4 5 WIRING DIAGRAM LESS STARTER 310EDE546 A Ref Drawing Page 1 of 2 ...
Страница 35: ...13 20 604 Page 34 310EDE546 A Ref Drawing Page 2 of 2 ...