background image

 

 

Page 18 

 

trouble  free  operation  of  this  pump.  It  is 
highly  recommended  that  the  customer  set 
up a maintenance program during the run-in 
period.    The  periodic  maintenance  data 
should  be  recorded  and  kept  with  other 
pump 

documents. 

The 

following 

recommendations, 

based 

on 

previous 

experience,  should  serve  as  a  guideline  for 
establishing  a  good  maintenance  program. 
The  periodic  maintenance  schedule  is 
divided  into  daily,  monthly,  and  quarterly 
tasks  to  be  performed  by  the  user  after  the 
pump  has  gone  through  100  hours of wear-
in  period.  For  the  tasks  performed  during 
the  wear-in  period,  see  "Startup  and  New 
Pump Run-In Procedure," page 16. 
 
Daily Routine Maintenance Tasks 
1. 

Check  the  oil  level  in  the  lube  oil 

 

reservoir. 

 
2. 

Periodically  monitor  lube  oil  operating 
pressure and temperature. Minimum oil 
operating  pressure  is  40  psi.  The 
maximum  oil  operating  temperature 
depends  on  a  particular  grade  of  oil 
used  in  the  pump  lube  system.  (See 
FIGURE  3-1, page 16).   

 
3. 

Check  the  lube  pump  suction  inlet 
vacuum.    A  vacuum  gage  reading 
higher than 10" Hg or 5 psi or 0.34 bar 
indicates  that  the  suction  strainer 
and/or  oil  filter  element  are  clogged.  
The strainer must   be cleaned, and the 
oil filter element   replaced 

as 

necessary as soon as the pump can be 
shut  down  for  a  short  period  of time to 
perform these tasks. 

 
4. 

Listen for any abnormal noise or rough 
operation, which may indicate the need 
for  fluid  end  maintenance  such  as 
changing  valves  or  valve  seats.    Due 
to  very  high  pressures  in  the  triplex 
pump fluid end, worn valves and seats 
should be changed as soon as possible 
to  prevent  washing  them  out  with  the 
pumped fluid. 

 
5. 

Check  the  plunger/packing  lubrication 
pump  for  proper  operation.    Insure 
packing nut is tightened sufficiently into 
stuffing  box.    Recheck  tightness  after 
extended continuous operation. 

 

Monthly  (100 hour) Routine Maintenance 
Tasks 
1. 

Clean  the  strainer  and  replace  the  oil 
filter element. 

2.    Check  the  entire  lube  system  for  leaks 

 and eliminate them. 

 
3. 

Check  all  fluid  end  expendables  such 
as   valves,  packing,  and  valve  seats 
and  replace them as necessary. 

 
4. 

Check  the  extension  rod  seals  and 
replace them as necessary. 

 
Quarterly (300 hour) Routine 
Maintenance Tasks 
 
1. 

Change  the  lube  oil  and  clean  the  oil 
reservoir thoroughly. 

 
2. 

Clean  the  lube  system  strainer  and 
replace the oil filter elements. 

 
3. 

Re-tighten  the  critical  bolt  joints 
following  torque  specifications given in 
Section 6. 

 
4. 

Add grease to any exposed bare metal 
to prevent corrosion. 

 
5. 

Clean or replace the breather cap filter 
element. 

 
6. 

Check  all  pressure,  temperature,  and 
vacuum  gages  for  proper  operation 
and replace as necessary. 

 
7. 

Check  all  lube  system  warning  and 
alarm devices for proper operation and 
replace if found defective. 

 
8. 

Check  supply  of  on  hand  expendables 
such  as  packings,  valves  and  seats, 
maintenance  items  such  as  seals,  O-
rings,  oil  and  breather  filter  elements, 
and  also  maintenance  tools.  Order  to 
replenish supplies as necessary.    

 
The 

recommended 

routine 

periodic 

maintenance  procedures  are  very  simple 
and  can  be  performed  in  a  short  period  of 
time.  At  the  same  time,  close  adherence to 
these 

procedures 

will 

ensure 

long, 

economical,  and  trouble  free  operation  of 
the pump.  

Содержание C2500Q QUINTUPLEX

Страница 1: ...ECN 1058968 GARDNER DENVER 300CMC996 Revision C April 2011 WELL SERVICING PUMP MODEL C2500Q QUINTUPLEX OPERATING AND SERVICE MANUAL...

Страница 2: ...lled in pump maintenance and repair They are ready to respond and assist you by providing fast expert maintenance and repair services For the location of your local authorized Gardner Denver distribut...

Страница 3: ...tion and minimal downtime DANGER Danger is used to indicate the presence of a hazard which will cause severe personal injury death or substantial property damage if the warning is ignored WARNING Warn...

Страница 4: ...ons For Ordering Repair Parts i Foreword ii Index iv List of Illustrations v Section 1 Danger Notices 1 Section 2 Design and Description 9 Section 3 Preparation Operation and Maintenance 14 Section 4...

Страница 5: ...er Packing 16 Monthly Routine Maintenance Schedule 18 Oil Stop Head Seal Retainer and Gear Covers 23 Ordering Instructions Repair Parts i Periodic Routine Maintenance Schedule 17 Plunger Packing Lubri...

Страница 6: ...ure 2 1 C 2500Q Quintuplex Pump 9 Figure 2 2 C 2500Q Gear Reduction Unit 11 Figure 2 3 C 2500Q Fluid End 13 Figure 3 1 Lubricant Recommendations 16 Figure 4 1 Fluid End Removal and Assembly 21 Figure...

Страница 7: ...en operating high pressure pumping equipment Operators should not begin or continue operations when tired distracted or under the influence of alcohol or any type of prescription or nonprescription dr...

Страница 8: ...damaged or badly worn Wear safety shoes and goggles Check to insure they have safe footing Fully engage the wedge to prevent it from disengaging violently from the cover as a blow is struck Wipe their...

Страница 9: ...to the lifting attachments normally built into the package unit support skid Packages too large to lift as fully assembled should be separated into smaller loads For these smaller loads the lifting d...

Страница 10: ...ef pressure Any pipe line used to direct pressurized relief flow to another location such as a collecting tank is not blocked The discharge system is not blocked and all the discharge line valves are...

Страница 11: ...engine start switches or starter controls are clearly tagged with warnings not to start the pump while repair work is in process Whenever the pump is operating continually monitor the entire suction d...

Страница 12: ...he atmosphere all around the pumping site for the presence of flammable or explosive vapors Do not begin operation and stop ongoing operation if flammable or explosive vapors are detected Hot surfaces...

Страница 13: ...s with rough grip surface and ear noise protection Full operator attention and alertness are required when operating this equipment to avoid personal injury death and or equipment damage The operators...

Страница 14: ...se wands nozzles guns connections and hose etc be considered for purchase that you judge to offer the highest quality of design construction and safety since these components are among the most critic...

Страница 15: ...and also all other applicable safety rules and regulations must be carefully observed The sections on Pump Design Description and Specifications describe the pump design list the pump specifications a...

Страница 16: ...icity The connecting rods bolt to the conn rod bearing housings The conn rod bearing housings are accessible through the rear of the pump and the connecting rod crosshead assemblies through the nose o...

Страница 17: ...rosshead slides This is repeated for the rest of the main bearing and crosshead components Oil is removed from the power end through a 4 drain connection in the bottom of the frame Oil passages in the...

Страница 18: ...the packing nut or gland Plunger packing lube holes are provided in the fluid cylinder The EWS Fluid End is a forged alloy steel block is designed for severe applications The EWS utilizes heat treated...

Страница 19: ...31 6100 4 2 17 217 17900 326 11800 544 7100 718 5350 4 5 2 75 275 14150 413 9350 688 5600 908 4250 5 3 40 340 11450 510 7550 850 4550 1121 3450 5 5 4 11 411 9500 617 6250 1028 3750 1357 2850 5 75 4 49...

Страница 20: ...rust preventative will not clog the oil passages 5 Remove the breather and either plug or tape the opening 6 Coat the gear reducer input shaft and all bear metal with a heavy rust preventive 7 Plug d...

Страница 21: ...ed pump size to minimize losses in the suction piping Lube Pump Suction Piping Sizing and Requirements In the past failure to meet these requirements has lead to pump damage because of restricted oil...

Страница 22: ...will be required to charge the fluid end suction manifold The charge pump should be sized according to the volume to be pumped by the quintuplex pump so that there is no less than 50 psi charge when t...

Страница 23: ...observe the suction vacuum gage reading oil pressure and temperature and check for leaks 12 Run the pump at 80 90 strokes per min at the following loads 40 of full rated load 30 min 60 of full rated l...

Страница 24: ...triplex pump fluid end worn valves and seats should be changed as soon as possible to prevent washing them out with the pumped fluid 5 Check the plunger packing lubrication pump for proper operation I...

Страница 25: ...etroleum EP 500 Summer or EP 300 Winter 10 F Shell Oil Co Torcula Oil 32 50 F Torcula Oil 100 20 F Torcula Oil 150 15 F Torcula Oil 320 10 F Sun Oil Co Rockdrill 500 Light 5 F Rockdrill 1000 Heavy 5 F...

Страница 26: ...p FLUID END SERVICE This discussion starts with the description of steps necessary for removal and installation of the fluid cylinder assembly and proceeds to the removal and replacement of expendable...

Страница 27: ...stay rods 6 Reinstall the plunger clamps piping connections and auxiliary equipment FIGURE 4 1 C 2500 Fluid End Plunger and Packing Replacement This service procedure can be performed with the fluid c...

Страница 28: ...or cut a valve seat with a torch Severe damage to the fluid end may occur Before starting make sure that special tools required for this procedure are available For part numbers of the tools see the P...

Страница 29: ...d pops POWER END SERVICE DANGER Before attempting to service the power end of the pump the following safety precautions must be observed 1 Shift the pump transmission into the neutral gear 2 Shut off...

Страница 30: ...ment pins PILOT the halves together Do not damage pins 3 CAUTION Both halves are heavy 4 Remove half bearing with prying action 5 Rod half of bearing may be tapped on one edge with a rubber hammer or...

Страница 31: ...d Removal and Installation page 20 3 Remove the oil stop head seal retainer and gear covers as described in Oil Stop Head Seal Retainer and Gear Covers page 23 4 Remove the crosshead assemblies as des...

Страница 32: ...Page 26...

Страница 33: ...ap rings and braze together in 3 or 4 places for strength WARNING Do not drive against rollers or bearing cage Drive only against the bearing race as severe damage to the bearings could occur WARNING...

Страница 34: ...ogged suction line 3 Clean out line 4 Suction and or discharge 4 Remove the obstruction valves propped open Low Discharge Pressure 1 Worn or fluid cut valve 1 Replace valve assembly 2 Valve propped op...

Страница 35: ...tling time in supply tank Reduce pump speed 10 Air entering suction line 10 Repair suction line 11 Air entering charging pump 11 Tighten or replace shaft packing or seal 12 Air entering or charge gas...

Страница 36: ...transmitted to 11 See Excessive Valve power end Noise problem 12 Cavitation noise transmitted 12 See Cavitation Fluid to or causing shock loading in Knock or Hammer problem power end Excessive Valve N...

Страница 37: ...sealing surface 4 Corrosion due to wrong 4 Determine and install correct stuffing box material stuffing box for pumped fluid 5 Stuffing box bore worn 5 Replace stuffing box Pumped Fluid In 1 Worn dam...

Страница 38: ...Customer Service 5 Wrong size packing 5 Install correct size packing 6 Improper packing installation 6 Check installation procedure and install correctly 7 Excessive crosshead wear 7 Replace crosshead...

Страница 39: ...mmer problem Stud Failures 1 Catastrophic failures 1 See Catastrophic Failures problem 2 Improper nut torquing 2 Check torque specifications and torque to correct values 3 Stud bending due to uneven 3...

Страница 40: ...e Assembled in Bearing Housing 7 266 7 268 Crosshead Guide Bore 9 874 9 872 Crosshead OD 9 858 9 856 Wristpin Dia 2 500 2 499 Wristpin Bushing Bore 2 508 2 509 RECOMMENDED RUNNING CLEARANCES ACTUAL Ne...

Страница 41: ...Page 34...

Страница 42: ...Plunger Clamp Bolts 1 2 13 58 5 8 11 110 Pinion Bearing Housing 3 4 10 160 Intermediate Rod to Crosshead 3 4 10 160 Conn Rod to Bearing Housing Lock Nuts 3 4 10 180 Fluid End Suction Manifold 7 8 9 26...

Страница 43: ...anty Period for all products is 1 250 hours of operation or three 3 months after start up not to exceed 120 days after delivery to Purchaser whichever occurs first The exceptions are as follows 1 Powe...

Страница 44: ...regoing warranty is the sole and exclusive warranty of the Company The Company hereby extends other manufactures warranty or guaranties if any given to Company by such manufacturer but only to the ext...

Страница 45: ...o this warranty shall not be construed as an admission by the Company that any product was not as warranted WARRANTY REQUESTS Products to be returned for warranty analysis shall be approved for return...

Страница 46: ...representative or Gardner Denver Inc 4747 South 83rd East Avenue Tulsa OK 74145 PH 918 664 1151 800 637 8099 FAX 918 664 6225 www gardnerdenver com Specifications subject to change without notice Cop...

Отзывы: