ZN
‐
PTZ(W)xxVPIPE4100/IPE4500
Installation
Guide
06A.02
15
DIP
Switch
Before
you
install
the
camera,
you
should
set
the
DIP
switches
to
configure
the
camera
ID,
communication
protocol.
7
1 2 3 4 5 6
ON
8
7
1 2 3 4 5 6
ON
8
UNLOCK
2 mm
5
4
7
8
6
5
4
7
ON
2
1
ON
2
1
3
3
DIP1
‐
Camera
ID
DIP
2
‐
RS485, PTZ
protocol,
Baud
rate
6
8
Placing
dome
cover
Opening
dome
cover
Place
dome
cover
and
rotate
to
tighten
Unlock
the
screw
Rotate
the
cover
to
remove
Lock
the
screw