ZN
‐
DT350VE/ZN
‐
DNT350VE/ZN
‐
DWNT350VE
Installation
Guide
2010/2
‐
1
03A.02
7
4. INSTALLATION
Note
i
When
assembling
the
main
body
of
the
ZN
‐
DT350VE/ZN
‐
DNT350VE/ZN
‐
DWNT350VE
and
its
dome
cover,
make
sure
they
fit
each
other
into
place.
1)
Connect
the
LAN
cable,
power
supply
cable,
and
the
video
loop
out
cable
with
the
ZN
‐
DT350VE/ZN
‐
DNT350VE/ZN
‐
DWNT350VE.
2)
Place
the
installation
template
on
the
ceiling.
3)
Drill
three
holes
on
the
template
and
insert
anchor
blocks
into
the
holes.
Fasten
the
ZN
‐
DT350VE/ZN
‐
DNT350VE/ZN
‐
DWNT350VE
with
screws.
4)
Put
the
dome
cover
on
the
main
body
of
the
ZN
‐
DT350VE/ZN
‐
DNT350VE/ZN
‐
DWNT350VE.
Make
sure
the
main
body
and
the
cover
fit
each
other
into
place.
5)
Fasten
the
cover
with
screws.