background image

GAT Access 6100 Terminal Series 
Electrical Connections 

 

40

 

HB_GAT-ACCESS6100--EN_14

  

www.gantner.com

 

 

Figure 4.7 - Connection of the GAT Access 6100 F PoE to a turnstile 

 

The GAT Access 6100 F PoE provides the option of connecting a GAT FR 055 (Part No. 557433) or GAT FR 055 
FIU3k (Part No. 557534) fingerprint reader. The fingerprint reader cable connects to the 4-pin socket on the rear part 
of the GAT Access 6100 F PoE as shown in Figure 4.8. 

 

See the GAT FR 055 datasheet for detailed information on installing and connecting a GAT FR 055 / GAT FR 
055 FIU3k. 

 

 

 

Figure 4.8 - Connection of a fingerprint reader to the GAT Access 6100 F PoE 

 

Содержание GAT Access 6100 Series

Страница 1: ...EN_14 1 GAT Access 6100 Terminal Series Access Control and Shower Control Terminals Installation Commissioning Operation Document Version 1 4 GAT Access 6100 GAT Access 6100 F BIO GAT Access 6100 F En...

Страница 2: ...n this manual shall depend exclusively on the conditions of the guarantee Any further reaching claims are excluded and in particular the manufacturer accepts no liability for the completeness or accur...

Страница 3: ...tended to inform the user about potentially hazardous situations or important information for the safe and proper use of the described product s The safety messages also include directives on how to a...

Страница 4: ...al Words Indicates a hazardous situation that if not avoided may result in minor or moderate injury Indicates information considered important but not hazard related e g messages relating to property...

Страница 5: ...the product must be carried out in accordance with the technical conditions of operation as described in the corresponding documentation Therefore it is essential to read the corresponding chapter of...

Страница 6: ...INFORMATION U S A Note This equipment has been tested and found to comply with the limits for a Class B digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reason...

Страница 7: ...nt Station 35 4 2 2 GAT Access 6100 GAT Access F BIO GAT TimeAxx6150 35 4 2 3 GAT Access 6100 F PoE 36 4 3 Network Connection 37 4 3 1 GAT Access 6100 GAT Access F BIO GAT TimeAxx6150 GAT Access F Enr...

Страница 8: ...GAT Access 6100 86 8 4 Which bit rates are used by a GAT Access 6100 for Ethernet and is this configurable 86 8 5 How can I set the date and time of a GAT Access 6100 86 8 6 How can I find the IP add...

Страница 9: ...0 EN_14 9 9 8 Fingerprint Reader 95 9 9 Housing 95 9 10 Ambient Conditions 95 9 11 Dimensions 96 9 11 1 GAT Access 6100 GAT Access 6100 F PoE 96 9 11 2 GAT Access 6100 F PoE 96 9 11 3 GAT Access 6100...

Страница 10: ...GAT Access 6100 Terminal Series Table of Contents 10 HB_GAT ACCESS6100 EN_14 www gantner com...

Страница 11: ...agrams and information required to install the GAT Access 6100 terminals Chapter 4 ELECTRICAL CONNECTIONS includes information on how to complete the power and network connections of the GAT Access 61...

Страница 12: ...th example text is used in this manual to display important safety critical information that must be read and followed NOTE Following on from this signal word in the manual is a reference text that mu...

Страница 13: ...gy each terminal supports GAT Access 6100 B LEGIC prime GAT Access 6100 BA LEGIC advant GAT Access 6100 F MIFARE GAT Access 6100 ISO ISO 15693 GAT Access 6100 F PoE MIFARE GAT Access 6100 F BIO MIFARE...

Страница 14: ...turnstiles or gates that control the entry or exit to certain areas The access terminal checks the authorization of visitors and allows entry through an access point such as a turnstile or gate The te...

Страница 15: ...ader GAT FR 055 8 Fingerprint sensor of GAT FR 055 9 Weather protection cover optional Figure 2 3 GAT Access 6100 F BIO The GAT Access 6100 F Enrollment Station is located at a central location such a...

Страница 16: ...the illuminated round RFID scan field the GAT Access 6100 reads the information on the data carrier and sends the data over the network Ethernet to a server for evaluation The visitor s authorization...

Страница 17: ...ends the information of a data carrier over the interface to the host computer and waits for an appropriate reaction from the host An exception is the GAT Access 6100 F Enrollment Station which usuall...

Страница 18: ...GAT Access 6100 Terminal Series General Information 18 HB_GAT ACCESS6100 EN_14 www gantner com...

Страница 19: ...on The GAT Access 6100 terminals can be mounted directly onto a flat surface such as a wall The device rear part attaches to the flat surface e g concrete wall using screws NOTE The GAT Access 6100 mu...

Страница 20: ...asurements Cable Inlets The housing of the GAT Access 6100 has cable inlets for either flush 1 or surface 2 mounted cabling For surface mounted cabling ensure that the cabling can still be inserted on...

Страница 21: ...aggressive detergents for cleaning Do not damage the socket contacts 2 Ensure that the orientation is correct and plug the connection cable into the socket on the device rear part 3 Clip the top of t...

Страница 22: ...or surface mounted cabling 4 Mounting holes 5 Mounting screws 6 Terminal attachment holes 7 Back box 8 Flush mounted cabling 9 Surface mounted cabling Figure 3 4 GAT Access 6100 F PoE installation mea...

Страница 23: ...n the mounting plate and both hooks 12 of the mounting plate also lie in the holes of the GAT Access 6100 F PoE For surface mounted cabling ensure that the connection cable runs in the guide slot 9 on...

Страница 24: ...wing measurements Figure 3 7 Dimensions of GAT FR 055 rear part and mounting holes a Connection Cables The connection cables power supply network etc are run through the cable lead ins of the GAT FR 0...

Страница 25: ...ays be performed in a powerless state See chapter 4 ELECTRICAL CONNECTIONS for more information Attaching the GAT Access 6100 F Front Part 1 Check the socket in the device rear part Any dirt dust and...

Страница 26: ...pened with the supplied special tool With this the two catches on the bottom of the device can be unlocked in succession Figure 3 11 Opening the housing Maintenance The sensor field of the GAT FR 055...

Страница 27: ...HB_GAT ACCESS6100 EN_14 27 3 6 GAT Access 6100 F Enrollment Station The GAT Access 6100 F Enrollment Station is mounted onto a stainless steel stand and placed directly onto a table or similar Figure...

Страница 28: ...l without any back box 3 7 1 Surface Mounting 1 Apply silicone around the cable entrance on the device rear part This is necessary to seal the housing after it is mounted onto the wall Apply the silic...

Страница 29: ...device rear part See chapter 4 ELECTRICAL CONNECTIONS for information on the pin assignment and electrical specifications 4 Insert the rubber seal 5 in the device rear part 5 Attach the device front...

Страница 30: ...latches without the need for screws 3 7 2 Flush Mounting For flush mounting of the GAT TimeAxx 6150 a box is included with the terminal The back box can also be ordered separately GAT TimeAxx 6150 UP...

Страница 31: ...opening in the GAT TimeAxx 6150 rear part with silicone 1 see step 1 of section 3 7 1 Surface Mounting 5 Mount the GAT TimeAxx 6150 into the back box using three screws 2 see step 2 of section 3 7 1 S...

Страница 32: ...alls ATTENTION Humidity water must never be able to penetrate into the housing Ensure that the silicone applied step 1 of section 3 7 1 Surface Mounting completely seals the housing and that the rubbe...

Страница 33: ...section a Installation in Brickwork Walls ATTENTION Humidity water must never be able to penetrate into the housing Ensure that the silicone applied step 1 of section 3 7 1 Surface Mounting completel...

Страница 34: ...GAT Access 6100 Terminal Series Installation 34 HB_GAT ACCESS6100 EN_14 www gantner com...

Страница 35: ...ctrical installations where the GAT Access 6100 is being installed e g electrical connection only by suitably trained electricians material specifications and tools used Also observe the environmental...

Страница 36: ...nection 4 2 3 GAT Access 6100 F PoE The GAT Access 6100 F PoE requires a nominal voltage of 48 VDC see technical data which can be supplied via an Ethernet switch with Power over Ethernet PoE capabili...

Страница 37: ...ommended to connect each GAT Access 6100 to a separate switch or patch panel socket Figure 4 3 Ethernet network example 4 3 1 GAT Access 6100 GAT Access F BIO GAT TimeAxx6150 GAT Access F Enrollment S...

Страница 38: ...ding on which Ethernet standard is used 568A 568B TX green white orange white TX green orange RX orange white green white RX orange green Figure 4 5 Wire termination colors for Ethernet cables 4 3 2 G...

Страница 39: ...nts as indicated in the technical data see 9 TECHNICAL DATA 4 4 1 GAT Access 6100 GAT Access F BIO GAT TimeAxx6150 GAT Access F Enrollment Station Figure 4 6 shows how the input output cabling is conn...

Страница 40: ...of connecting a GAT FR 055 Part No 557433 or GAT FR 055 FIU3k Part No 557534 fingerprint reader The fingerprint reader cable connects to the 4 pin socket on the rear part of the GAT Access 6100 F PoE...

Страница 41: ...the GAT Access 6100 Enrollment Station Installation Cable between device rear part and front part connected to both parts Housing closed and sealed Power supply connected Interface connected Host ser...

Страница 42: ...GAT Access 6100 Terminal Series Electrical Connections 42 HB_GAT ACCESS6100 EN_14 www gantner com...

Страница 43: ...es of GAT Access 6100 share the same start up procedure The initialization process starts after power is supplied to the terminal The GANTNER logo and the current software version BL Vers is displayed...

Страница 44: ...up The system settings can be changed via the service menu see 5 3 1 Service Menu of the GAT Access 6100 If the service menu is not opened i e if no action is performed at the terminal the GAT Access...

Страница 45: ...on of the GAT Access 6100 While this display is shown the function keys on the front of the GAT Access 6100 must be pressed in the following sequence 1 1 4 4 2 3 Figure 5 4 Keys for activating the ser...

Страница 46: ...This principle works for all the settings in the service menu The following settings can be made DHCP Set to on if a DHCP server is used in the network In this case the remaining settings IP address s...

Страница 47: ...o the reading field is read and displayed Read Clear Authorization These menu items are only shown for LEGIC readers With these functions it is possible to display or clear the authorization data stor...

Страница 48: ...hange the number with the keys 1 and 2 The set contrast can be seen directly while changing the contrast value With Default the contrast value can be reset to the default value Confirm with key 4 OK 5...

Страница 49: ...6100 must be established by entering all the communication settings required for a manual connection Project configuration Creating a project where the GAT Access 6100 and its communication settings a...

Страница 50: ...ww gantner com Select the communication type Choose TCPIP then click Next Figure 5 13 Open device for direct configuration Wizard step 1 Enter the IP address and port number of the GAT Access 6100 the...

Страница 51: ...m the device Figure 5 16 Configuration window for the GAT Access 6100 The configuration settings of the GAT Access 6100 are organized into several categories The directory on the left 1 lists the diff...

Страница 52: ...ftware scans the network and displays a list of all connected GANTNER devices Select your GAT Access 6100 from the list Use device details such as the IP and MAC address to identify the correct device...

Страница 53: ...Access 6100 click on the Display Texts tab Here you can edit each individual display text for the selected GAT Access 6100 see 5 4 4 Display Texts To view and adjust the configuration settings of the...

Страница 54: ...r IPv4 Dynamic default gateway Default gateway got from the DHCP Server IPv4 100 MBit Ethernet enabled Enable 100 MBit Ethernet link 10 MBit if disabled Boolean true Protocol Terminal address Address...

Страница 55: ...stored on their data carriers for verification Compatibility If the host responds to the Card_Ident Command with the state 0x00 the Verification process is started Compatibility Mode Selection Deactiv...

Страница 56: ...license is loaded the terminal allows the writing of data from the management software directly to the data carrier Boolean false Second Ident with Card With this option it will be allowed to confirm...

Страница 57: ...Block Number Block number of the third party segment Integer 0 Mask The block that is read from a data carrier is logical AND combined with this mask value and then compared with the Result value Hex...

Страница 58: ...for reading the third party data Selection Key A Key B Third party write key Write key to be used for writing the third party data Selection Key A Key B DESFire Options for reading of MIFARE DESFire D...

Страница 59: ...display the entire text line The access terminals can only show signs of windows code page 1252 Western European 1251 Cyrillic and 1257 Baltic All other signs will be shown as on the display Definitio...

Страница 60: ...6100 In Offline Emergency mode it is possible to read data from any block within any sector of a data carrier With a configurable mask the read data can be separated into relevant and non relevant dat...

Страница 61: ...GAT ACCESS6100 EN_14 61 3 Enter the Offline License number into the configuration option Application General Device License 4 The configuration option Emergency Mode enabled must also be checked 5 Con...

Страница 62: ...ield Result The result of the AND calculation of the read data and the Mask value are compared with this Result value If both values match access is granted If not access is denied In the previous exa...

Страница 63: ...Enrollment Station is Offline Emergency Mode where the start screen is as shown in Figure 6 2 Figure 6 1 GAT Access 6100 start screen in standard Figure 6 2 Standard start screen of a GAT Access oper...

Страница 64: ...ches to either out of operation mode or emergency mode depending on configuration 6 2 2 Emergency Mode Emergency mode can be enabled or disabled in the functionality settings of the GAT Access 6100 se...

Страница 65: ...ich are read by holding them next to the RFID scan field 4 of the internal antenna The LED of the scan field changes color accordingly to indicate different status information Additional status inform...

Страница 66: ...data carrier information to the host for evaluation with the stored personal data If access to the restricted area is granted a command is sent to the GAT Access 6100 and the terminal will unlock the...

Страница 67: ...ashes green and two acoustic signals are emitted Figure 6 6 Information display if the user must press a key The user must press one of the four keys below the display to gain access otherwise access...

Страница 68: ...the visitor to put one of the fingers that is stored on their data carrier onto the fingerprint reader Only when the scanned fingerprint matches one of the fingerprints on the data carrier are the fol...

Страница 69: ...n is not shown and you can begin directly with step 2 2 Hold the visitor s data carrier next to the RFID scan field of the Enrollment Station First the display will briefly show Enrollment and then in...

Страница 70: ...ee chapter 6 6 4 Cleaning the Fingerprint Sensor 5 Once the fingerprint has been correctly scanned the visitor must remove their finger from the sensor and repeat step 3 using the same finger The fing...

Страница 71: ...arrier must be read once more to save the data onto the data carrier Request for data carrier 9 Hold the user s data carrier next to the RFID scan field within 3 seconds The fingerprint data is writte...

Страница 72: ...ted Access can then be completed using the data carrier alone without the need to scan the fingerprint 1 Press the second button on the Enrollment Station The display shows the message Finger off 2 Ho...

Страница 73: ...y message is shown on the display 2 Depending on whether there is fingerprint data stored on the data carrier or not the following two options are possible a No fingerprint data saved on data carrier...

Страница 74: ...enrollment station as follows Verification successful Error Verification not successful 6 6 4 Cleaning the Fingerprint Sensor The sensor surface should be regularly cleaned to guarantee a distinct an...

Страница 75: ...segment LED bar shines green to indicate that the equipment is available for use Figure 6 8 Information display of GAT TimeAxx 6150 in idle state In order to activate the equipment the user holds the...

Страница 76: ...ld while the equipment is turned on and the terminal will turn off the equipment and pause the countdown The display indicates the paused state Figure 6 10 Pausing the equipment To reactivate the equi...

Страница 77: ...operation The GAT Access 6100 must communicate with a server host that decides if the data carrier is valid and if the controlled door or turnstile may be unlocked If the server host is not available...

Страница 78: ...he data carrier is held in front of the reading field until the locker check in process is complete If the data carrier is removed before the process is complete access is denied and the GAT Access 61...

Страница 79: ...all other relays are configured to No function then only Relay 1 will be activated when an optocoupler set to External Release receives an input Alternatively if all the relays are configured to Entra...

Страница 80: ...GAT Access 6100 Terminal Series Operation 80 HB_GAT ACCESS6100 EN_14 www gantner com...

Страница 81: ...are GAT Config Manager is used to check for new firmware versions and to upload the update to the GANTNER device An internet connection is required to allow GAT Config Manager to connect to the GANTNE...

Страница 82: ...NER server and returns a list of update packages Figure 7 2 Device update wizard If there is more than one update package available select the newest version and click Next A brief description of the...

Страница 83: ...00 This process usually takes around 1 2 minutes depending on this size of the update network speed etc Figure 7 4 Uploading file to GAT Access 6100 The update wizard displays the following message wh...

Страница 84: ...GAT Access 6100 Terminal Series Updating the GAT Access 6100 84 HB_GAT ACCESS6100 EN_14 www gantner com...

Страница 85: ...Config Manager This is done in three steps 1 Starting the device configuration wizard 2 Selecting the type of connection TCP IP with the following parameters Entering the IP address of the terminal P...

Страница 86: ...t is possible to adjust date and time in different ways a With GAT Config Manager software see 5 4 Configuration Settings b Directly at the terminal in the Service mode see 5 3 System Settings c With...

Страница 87: ...l is 0 0 0 0 There are different possibilities a If DHCP is activated install a DCHP server b Restart the GAT Device Finder software and the GAT Access 6100 If DHCP is activated it is possible to sele...

Страница 88: ...nline mode hold the authorization card SM100 or SAM 63 resp next to the scan field for approx 30 seconds b In the Service menu see 5 3 System Settings select Reader Read UID and then hold the authoriz...

Страница 89: ...Master Card_Ident Action_Started 8 16 Why does the GAT Access 6100 deny access with my data carrier in Emergency mode In emergency mode a GAT Access 6100 reads a certain segment LEGIC configurable MIF...

Страница 90: ...Pulse Time 300 Function Entrance Optocoupler 1 Function Entrance Event Trigger Falling Edge Fingerprint Verification Level 5 Mode Verification Deactivated Number Fingers 2 Site key 0 Display Contrast...

Страница 91: ...g is stored in a defined position on the data carrier and if the data carrier has access permission The Offline License can be ordered from GANTNER Electronic GmbH The serial number and MAC address of...

Страница 92: ...GAT Access 6100 Terminal Series Troubleshooting FAQ 92 HB_GAT ACCESS6100 EN_14 www gantner com...

Страница 93: ...er Source power supply Average power consumption GAT Access 6100 GAT Access 6100 F BIO Enrollment Station GAT Access 6100 F PoE 3 W Full operation with sensor on 4 5 W Full operation with sensor off 3...

Страница 94: ...Low 2 VDC UHigh 6 VDC Input current 4 5 mA 9 6 Data Time Management Data storage Internal EEPROM memory for configuration and booking data Data preservation min 10 years Internal clock Quartz controll...

Страница 95: ...FCC15 9 9 Housing Housing material Front part Rear part Stand of Enrollment Station Shockproof plastic PMMA Shockproof plastic PC ABS Aluminum Weight GAT Access 6100 BIO PoE GAT Access 6100 F Enrollme...

Страница 96: ...GAT Access 6100 Terminal Series Technical Data 96 HB_GAT ACCESS6100 EN_14 www gantner com 9 11 Dimensions 9 11 1 GAT Access 6100 GAT Access 6100 F PoE 9 11 2 GAT Access 6100 F PoE...

Страница 97: ...GAT Access 6100 Terminal Series Technical Data www gantner com HB_GAT ACCESS6100 EN_14 97 9 11 3 GAT Access 6100 F BIO 9 11 4 GAT Access 6100 F Enrollment Station...

Страница 98: ...es Technical Data 98 HB_GAT ACCESS6100 EN_14 www gantner com 9 11 5 GAT TimeAxx 6150 _ _ Note This manual is valid as of March 14th 2019 It is subject to change Amendments and changes can be made with...

Страница 99: ...16 T 61 29011 8114 info gantner com info gantner nl info aus gantner com London GB Bochum Germany Los Angeles USA T 44 1245 697588 T 49 234 58896 0 T 1 844 703 1139 info uk gantner com info de gantne...

Отзывы: