background image

During Installation

DO NOT connect this docking station to the vehicle battery until:

      1. ALL other electrical connections are made
      2. Mounting of ALL components is complete
      3. VERIFICATION that no shorts exist in the entire system

DO NOT install equipment or route wiring or chords in the deployment path of any

   air bag.

When drilling into the vehicle, DO make sure that both sides of the surface are

   clear of anything that could be damaged.

It is recommended to install a

32V - 10Amp in-line fuse connected as close to the

battery or power source as possible.

After Installation

Test the docking station to ensure that it is working properly.

File these instructions in a safe place and refer to them when performing
maintenance or re-installing.

WARNING: Failure to follow all safety precautions and instructions may result
in property damage, serious injury or death.

PRE-INSTALLATION RECOMMENDATIONS

Conduct a "Bench Test"
Gamber-Johnson strongly advises a "bench test" be conducted to verify that all electronic
and software issues are resolved prior to installation:
     1. Make sure computer is operational by itself.
     2. Insert computer into docking station and verify that the computer is operating in the
         dock.
     3. Interconnect entire assembly and verify start-up of all components, including other
         equipment (printers, modems, scanners, etc.).

*Gamber-Johnson also recommends positioning of all mounts and equipment in the vehicle
prior to the actual install to verify that mounting locations are safe and practical.

CAUTION: If wiring is shorted to the frame, high current conductors can cause
hazardous sparks resulting in electrical fires or flying molten metal.

Содержание Recon CF31 Military

Страница 1: ...ugh the Gamber Johnson Certified Installer Program copyright 2010 Gamber Johnson LLC This document is for the following products 7160 0377 Recon CF31 Military Docking Station The dock will hold a Pana...

Страница 2: ...ce or re installing WARNING Failure to follow all safety precautions and instructions may result in property damage serious injury or death PRE INSTALLATION RECOMMENDATIONS Conduct a Bench Test Gamber...

Страница 3: ...ar set of mount holes This is the recommended mounting location because the center of gravity is centered over the mount Gamber Johnson DS Clevis mounted to the front set of mount holes Secondary moun...

Страница 4: ...of isolator mounting holes This is the recommended mounting location because the center of gravity is centered over the mount 1 4 20unc threaded inserts for mounting to Gamber Johnson mounting equipme...

Страница 5: ...g holes J6 Female connector Out put power to dock J5 Male connector In put power from vehicle 88 5 46 2 33 7 18 1 43 3 92 7160 0377 Recon CF31 Military Docking Stattion Weight 11 lbs 18 32 Vdc Power S...

Страница 6: ...dia shackle Power Switch 1 4 20unc x 63 Stainless Steel Ground Stud torque nut to 65 85 in lbs Power Cable Port with Lanyard attached Cap D38999 Shell Size 9 Data Cable Ports with Lanyard attached Ca...

Страница 7: ...CLE AMPHENOL CONNECTOR JD38999 20FA35PN POWER SUPPLY CONNECTORS 15Vdc OUTPUT POWER TO DOCK AMPHENOL CONNECTOR JD38999 20FA35SN J5 PIN J5 SIGNAL 1 PWR_IN 2 GND 3 GND 4 GND 5 PWR_IN 6 PWR_IN J6 PIN J6 S...

Страница 8: ...USBDP3 13 USBDM3 14 USB3_PWR 15 5V_GND 16 5VDC 17 5VDC 18 NC 19 NC 20 PPTMDI3 21 PPTMDI3 22 5V_GND J4 PIN J4 SIGNAL 1 GND 2 DTR2 3 SOUT2 4 SIN2 5 DCD2 6 RI1 7 CTS1 8 R TS1 9 DSR1 10 GND 11 DTR1 12 SO...

Страница 9: ...I1 Bi Directional pair 1 or B J3 4 e PPTMDI0 Bi Directional pair 0 or A J3 5 f PPTMDI0 Bi Directional pair 0 or A J3 6 g PPTMDI3 Bi Directional pair 3 or D J3 20 h PPTMDI3 Bi Directional pair 3 or D J...

Страница 10: ...e the front edge of the computer into the dock The pocket on the front edge of the computer will fit onto the hook on the front edge of the dock Step 6 Rotate the wing turn compression latch 180 degre...

Отзывы: