Assembly Instructions
NOTE:
The following steps are for reference only. Consult your local hardware store for the best installation
method for your particular surface.
NOTE
: The solar light must be charged in the
ON
position for two sunny days for best results.
GS-94NS-PIR
1. Use an electric drill to make three holes into a solid surface no smaller than the fastening
screws (G). The holes shall be lined up with the holes of the lamp base (F).
2. Put the fastening screws (G) into the drilled holes with their threaded ends facing up (Fig. 3).
3. Place lamp base onto fastening screws and secure base with the nuts using a wrench (Fig. 4).
4. Make sure the lamp base (F) is stable before installing Part (D).
5. Place part (D) on top of part (F) and tighten with the provided screws (E) using a wrench.
6. Screw part (C) to part (D), part (B) to part (C) and part (A) to part (B).
Fig. 4
A.
Long Distance: 20-25 ft
B.
Medium Distance: 12-15 ft
C.
Short Distance: 8-12 ft
Fig. 3