background image

Page 2 - GVO1508  

 

Door Assembly 

Parts needed: 

c.  

Door sheet 

g. 

Door sides 

i. 

Door tops & Bottoms 

l. 

door strap 

n. 

hinges 

Method: 

Rivets are better for door assembly 

1.  Attach (i) door top & bottom to (c) door sheet @ centre ribs only 
2.  Attach (g) door sides to (c) sheet thru (i) @ 4 corners 
3.  Attach (l) door strap in centre of door sheet slipping under (g) fixing 

to sheet ribs and door sides 

4.  Attach hinges (n) approx 150mm from top and bottom of door thru 

(g) sides. Fixing should be centred on (g). 

5.  turn your door over and fix 4 corners thru all “U” channels. 

Hanging the Door 

Parts needed: 

- The door you have just made 

b.  1 x narrow sheet 

k. 

1 x “Z” door jamb (without channel attached) 

Method: 

1. Attach (k) 1830mm “Z” to narrow sheet (b) on the rib with 

the narrow pan. 

2. Lay the premade door face down on the narrow sheet ap-

prox 30mm up from bottom and down from top 

3. Check door is centralised on the sheet (top & Bottom). fix 

hinges through side of  “Z” door jamb (k). 

Front wall assembly 

Parts needed: 

 

- The pre-hung door you have just completed 

and 1 padbolt 

e. 

2 x 1515mm “U” channels 

h. 

2 x 793mm door spacers 

k. 

1 x “Z” corner door jamb (Has “U” chan-

nel attached) 

Method: 

1.  Lay down door with the sheet attached 

and the corner door jamb (“Z” with the “U” 
attached) as shown 

2.  Cap the sheets with (e) 1515 channels. 

Channels will end short of sheeting and 
corner door jamb by 10 - 15mm. 

Higher 

side of channel to inside.

 

3.  Attach the (e) 1515 channels to top and 

bottom of corner door jamb using (h) Door 
spacers to make sure door fits gap OK 
(they sit on top of the “Z” jambs).  

4.  Drill & Fix (Rivet or screw) channels at eve-

ry 

2nd 

rib down thru the top. 

5.  Attach door spacer at each end thru “Z” door jambs and channels.  
6.  3 fixings 

underneath 

thru channels into sheeting pan & top and bottom of (h) door spacers 

& “Z”s 

7.  Fit the padbolt to door strap on the outside door using wide flange rivets supplied (or 

screws). 

Drawings are diagrammatic and are not 

necessarily to detail. 

If you choose to vary from these instructions your warranty will be impaired. 

(e) 

(h) 

(h) 

(k) 

(e) 

(k) 

Page 3 - 

GVO1508

  

 

2: Back Wall 

4: End Walls 

If you choose to vary from these instructions your warranty will be impaired. 

3: Roof 

2: Back Wall 

(

a

(i) 

A. Cap 1 (a) sheet 

with (f) 735mm 
channels. 

B.  Fix the channels 

thru the end ribs 
and every 

2nd 

rib 

between. 

C. Make sure you put 

at least 2 fixings up 
thru the 

underside 

of the channel into 
the pan of the 
sheet. 

D. Same again for oth-

er side wall. 

You need: (per side) 

 

2 x (f) Channels 

 

1 x (a) Sheet 

(e) 

(

a

(e) 

You need: 

 

2 x (e) Channels 

 

2 x (a) Sheets 

A. Join 2 (a) sheets together with 

2 fixings thru the overlapping 
ribs making sure the ends of the 
sheets are flush. 

B.  Cap sheeting with (e) chan-

nels . 

C. Fix the channels thru the end 

ribs and every 

2nd 

rib between. 

D. Make sure you put at least 1 

fixing per sheet up thru the 

un-

derside 

of the channel into the 

pan of the sheet.  

(

e

(

e

(a) 

(e) 

(

d

(j) 

(e) 

A.  Join 2 (d) sheets together same as 

the back. 

B.  Cap sheeting with (e) 1515mm 

channels. 

C.  Fix the channels every 

2nd 

rib but 

not the corners at this stage 

D.  Place the short flange of (j) the “L” 

on top of the rib at 1 end. Make 
sure ends are flush with sheeting 
and put 1 fixing in the centre to 
hold the “L”. Fix the corners thru 
the channels and 1 more between 
the corner and the centre fixing. 
Perform the same at the other 
end. 5 fixings ea “L” 

You need: 

 

2 x (e) Channels 

 

2 x (d) Sheets 

 

2 x (j) “L”s 

(j) 

Содержание GVO1508

Страница 1: ... has U channel attached to give this shape for corner door jamb Front l 1 x GALVO Door strap 310mm long m 1 pack screws and padbolt n 1 pack of Rivets and hinges Caution Some parts have sharp edges and should be handled very careful ly We recommend the use of protective gloves and footwear when assembling All dimensions are approximate You will need these tools to assemble your shed Battery or ele...

Страница 2: ...s through side of Z door jamb k Front wall assembly Parts needed The pre hung door you have just completed and 1 padbolt e 2 x 1515mm U channels h 2 x 793mm door spacers k 1 x Z corner door jamb Has U chan nel attached Method 1 Lay down door with the sheet attached and the corner door jamb Z with the U attached as shown 2 Cap the sheets with e 1515 channels Channels will end short of sheeting and ...

Страница 3: ... sure the ends of the sheets are flush B Cap sheeting with e chan nels C Fix the channels thru the end ribs and every 2nd rib between D Make sure you put at least 1 fixing per sheet up thru the un derside of the channel into the pan of the sheet e e a e d j e A Join 2 d sheets together same as the back B Cap sheeting with e 1515mm channels C Fix the channels every 2nd rib but not the corners at th...

Страница 4: ... Adjust accordingly Fix L s at 300mm s apart 6th Using your ladder and tape measure fix down thru the top of the roof thru the pan into the top channel of front and back walls 10mm more than the overhang Fix beside every 2nd rib Fig 2 You will not need to worry about these fixings leaking as any water seep ing thru these fixings will end up on the outside of the walls 7th Attach padbolt to door st...

Отзывы: