INSTALLATION PROCEDURE
Refer to Installation Drawing for clarification. Check parts list to ensure all required
parts are included. Use an AS 4020 approved pipe joint sealant on all connections.
STEP 1:
Prepare the emergency shower foundation by using the floor flange as a
template. Locate the three holes for the 3/8-
16 UNC x 6” anchor bolts. (Not
supplied). They should extend
1” above the floor level.
STEP 2:
Once the concrete foundation is ready (dry), assemble the floor flange to the
anchor bolts; then securely fasten with 3/8-16 UNC Hex nuts and
3/8”
washers (Not supplied). Seal and tighten floor flange and (1-
1/4”) tee making
certain the waste tee is facing the proper location and the foot control holes
are facing side to side.
STEP 3:
Assemble nipple (1-
1/4” x 33”) to the tee and tighten with a pipe wrench.
STEP 4:
Assemble in the following order:
Attach intermediate coupling to nipple (1
-
1/4” x 33”)
Attach plugged nipple (1-
1/4” x 24”) and tee (1-1/4”) onto the coupling.
Attach nipple (1-
1/4” x 24”) onto the tee.
Attach tee (1-
1/4” x 1-1/4” x 1”) onto nipple.
Attach nipple (1” x 9”) valve assembly onto tee (1-1/4” x 1-1/4” x 1”)
Attach street elbow
(1”) and nipple (1” x 12-1/2”)
Attach nipple onto valve.
STEP 5:
Attach the showerhead onto street elbow (1”).
STEP 6:
Assemble the sign onto the unit. Use the strap, screws, washers and nuts
provided to mount the sign onto the upright. The sign should be
positioned for maximum visibility.
STEP 7:
Insert the plug into the optional supply line tee that is not used. Before
connecting the supply water line to the emergency shower;
CHECK IF THE
ASSEMBLY IS RIGIDLY TIGHTENED AND FLUSH THE LINE
THOROUGHLY.