
© Galvin Engineering Pty Ltd
Product Installation Guidelines
Version 4, 25
th
October 2022, Page
2
of 5
PRE-INSTALLATION -
MOUNTING DETAILS
−
If the mounting holes do not already exist, mark out and drill the holes in the bench/trough, as shown in
rough-in dimensions.
Note: Supplied flexi hose length is 225mm long. Maximum distance between outlet and handle is 180mm.
Note: Before installation, all lines must be flushed.
We recommend that a line strainer be installed prior to drinking taps to eliminate any foreign material
INSTALLATION
IMPORTANT: Galvin Engineering products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with
these provisions shall void the product warranty and may affect the performance of the product.
1. Disassembly
−
Remove the push button handle using the
provided 2mm hex key to loosen the grub
screw.
−
Remove the stainless steel lock nut using
an appropriate sized wrench. Do not
remove the top assembly.
−
Remove back nut and cup washer from the
outlet assembly.
2. Fit body & mouthguard outlet
−
Fit the valve body and mouthguard outlet into the
trough ensuring the rubber washers are placed
between.
−
Secure outlet underneath with the supplied cup
washer and back nut.
−
Secure valve body using the stainless steel locknut.
−
Take care not to over-tighten.
Rough-In Dimensions
*Only drill Ø2.5mm hole if anti-
rotation pin (not supplied) is
required.