Version 2, 31 October 2019, Page 

2

 of 

16

 

2.0 

TECHNICAL DATA

 

Inlet

 

½” B P – Male 

Outlet 

½” B P – Male 

Headwork 

Thermostatic mixing valve 

Working Pressure Range (kPa)  

Min 

20 

Max 

500 

Working Temperature Range (°C) 

Min 

Max 

85 

Finish 

Chrome 

Wall Recess required (mm) 

Ø157 x 6 

NOTE:  Galvin Specialised continually strive to improve their products.  Specifications may change without notice.

 

 

3.0 

SAFETY 

The CliniMix

®

 CP-BS Inwall Thermo Progressive ShowerMixer with GalvinCare Handle W&C is a high-

performance valve designed to give stable and dependable operation, provided it is installed, commissioned, 
operated and maintained as per the recommendations outlined in this manual. It should be noted however that this 
valve should not be considered as an alternative to adequate supervision and duty of care during its use and 
operation. 

 

4.0 

DESCRIPTION 

This manual covers the CliniMix

®

 CP-BS Inwall Thermo Progressive ShowerMixer with GalvinCare Handle W&C

.

 

This  product  is  designed  to  provide  water  from  ambient  cold  up  to  a  safe  maximum  temperature  for  showering. 
This mixing valve is supplied with integral isolating valves, strainers, check valves, flow regulators located in-body 
and a facility for thermal disinfection of the cold inlet side and mixed water outlet. 

 

5.0 

DIMENSIONS

 

 

 

Содержание CliniMix CP-BS

Страница 1: ...s The GalvinCare paddle handle provides straight forward temperature control and minimises ligature risk Suitable for high and low pressure systems with a thermostatically controlled water temperature...

Страница 2: ...e operation provided it is installed commissioned operated and maintained as per the recommendations outlined in this manual It should be noted however that this valve should not be considered as an a...

Страница 3: ...cordance with the provisions of AS NZS 3500 Installations not complying with AS NZS 3500 may void the product and performance warranty provisions 7 0 INSTALLATION The CliniMix Thermostatic Progressive...

Страница 4: ...s a split second it is still considered to be outside the operating conditions and may cause the valve to operate incorrectly In the event that this does occur measures must be taken to control the sp...

Страница 5: ...Before tightening the flange make sure the handle fits correctly Put screws into flange and tighten finger tight the flange should still be able to move Slide the handle onto spline and move the flang...

Страница 6: ...f the outlet temperature requires adjustment then follow the temperature adjustment in the installation instructions Shut Down Test Once the correct outlet temperature has been achieved the valves int...

Страница 7: ...flow to stabilise for at least 15 seconds and record the temperature Quickly isolate the hot water supply to the valve The outlet flow should quickly reduce to be less than 0 4L min following the isol...

Страница 8: ...a time to avoid the flange moving Refit handle 8 Fit the handle and fasten so the arrow shape on top of the handle matches the marking on the faceplate 11 0 ADJUSTMENT OF THE MIX TEMPERATURE 1 Set the...

Страница 9: ...ove cartridge nut and check cartridge Unscrew cartridge and remove from body Check the cartridge for wear and damage Replace if required replacement cartridge available through your supplier Check and...

Страница 10: ...mperature outlet then a 6 monthly servicing cycle may be adopted Otherwise servicing checks should be carried out more frequently e g every 4 months Follow the recommended maintenance procedures detai...

Страница 11: ...aged Raise hot water temperature Clean the cartridge ensuring that all debris is removed Mix temperature unstable Flow rate below 2L min Thermostatic cartridge contains debris or is damaged Strainers...

Страница 12: ...hat system must be in accordance with its m nuf turer s re mmend t n the C de nd re ev nt st tut ry nd t te r Terr t ry requ rements 4 The valve must be returned to Galvin Engineering together with a...

Страница 13: ...Pressure ________kPa Cold Water Pressure _______kPa Make of Mixing Valve _______________________ Model No ________________________ Size _________ Valve Location Building ______________________________...

Страница 14: ...k It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior Date of Valve Commissioned...

Страница 15: ...f Warm Water C One Outlet in Use All Req d Outlets in Use One Outlet in Use All Req d Outlets in Use 1 2 3 4 5 6 7 8 9 10 11 Give details of brand and model designation Commensurate with the design fl...

Страница 16: ..._______________________________Signature ______________________ Date _______________________ Maintenance Tests Yes Date of Previous Service ______________________________________________ Previous Serv...