
© Galvin Engineering Pty Ltd
Product Installation Guidelines
Document No.: 001.00.10.08
Version 1, 12 July 2022, Page
2
of
5
PRE-INSTALLATION
-
MOUNTING DETAILS
In-wall valve body
−
In-wall valve body must have
G5/8”
female
head
to
body
thred
connection.
−
Body should be mounted between 0
and 15mm behind the finished wall
surface.
Wall spud
-
Wall spud must be ½” BSP male thred and
protrude from the finished wall by no more than
15mm
Note: In some situations, a male thread
connection on the spout may be more suited. If
so, please contact us on 1300 514 074
Note: Before installation, all lines must be flushed. We
recommend that a line strainer be installed prior to taps
to eliminate any foreign material.
TCWSC80C/TCWSJ80C
TCWSC150C/TCWSJ150C